ML20031C148
| ML20031C148 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 04/10/1981 |
| From: | Bernard D YANKEE ATOMIC ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20031C146 | List: |
| References | |
| NUDOCS 8110060583 | |
| Download: ML20031C148 (5) | |
Text
..
. ~
4 p -
O 4.
S e
1-5 j
1 J
t YANKEC ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81 FOR THE MONTH OF MARCH, 1981 J-i 4
e 1
t i
+
e 6
f f
e r
4 8110060583 810410 PDR ADOCK 05000029-R PDR i
OPERATING DATA REPORT DOCKET NO.
50-29 DATE 810410 CO31PLETED BY D. M. Bernard TELEPHONE - 617-S72-S100 X2390 OPERATING STATUS Yankee Rowe Notes
- 1. Urdt Name:
March. 1981 Power level restricted by
- 2. Reputin: Period:
- 3. Licensed Thermsl Power (MWt):
600 installation of baffle 185 plates in turbine.
- 4. Nsmepiste Ratin;(Gross $1We):
175
- 5. Desi;n Electries! Rating (Net MWe):
180
- 6. Maximum Dependsb!e Capseity (Gross MWe):
175
- 7. I.laximum Dependable Capscity (Net MWe):
- 8. If Chan;es Occur in Capscity Ratin;s (!tems Number 3 Throu;h 7) Since Last Report,Give Reasons:
' 9. Power Lese! To Which Restricted.If Any (Net MWe):
150 MWe
- 10. Reasons For Restrictions.!f Any:
See Notes This >fo '.
Yr.-to-Ds:e Cumulstive 744.00 2,160.00
- 11. Hours in Reportin; Period 744.00 2.107.13 142,441.41
- 12. Number Of Hours Reactor Was Critics!
0.00 0.00 0.00
- 13. Resetor Resene Shutdown Hours 744.00 2,091.52 133,053.25
- 14. flours Cenerstor On.Line
- 15. Unit Resene Shutdown Hours 0.00 0.00 0.00
- 16. Cross Therms! Energy Genersted (MWH) 375,147.00 1.160,014.00 74,033,794.81
- 17. Gross E!cetries! Ener;y Genersted (MWH) 100,261.S0_
311,751.30 22,696,S91.80
- 18. Net E ectrics! Ener;y Cenersted (MWH) 92,156.31 289.032.77 21,247.142.46
- 19. Unit Sen-ice Factor 100.00 96.83 77.27 100.00 96.83 77.27
- 20. Unit Availsbility Factor 70.86 76.46 70.12
- 21. Unit Capacity Fsetor (Usin; MDC Net) 70.86 76.46 70.12
- 22. Unit Capseity Factor (Using DER Net) 0.00 3.17 5.35
- 23. Unit Forced Outs;e Rate
- 24. Shutdowns Schedu?ed Over Next 6 Months (Type. Date.snd Durstion of Eschi:
A six week refueline and maintenance shutdown is scheduled to becin Mw 2.
1981.
- 25. If Shut Down At End Of Report Period. Estimated Date ar 9:
- 26. Units in Test Status (Prior to Commercis! Operatior '
Forecast Achiesed INITI A L CRITICA LITY INITIA L ELECTRICITY COMMERCI A L OPERATION ic/77)
c AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rowe DATE 810410 CO31PLETED BY D. M. Bernard TELEPHONE 617-872-8100 X2390-MONTH MARCH, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Netl 1
134.2 37 123.6 2
133 5 18 122.6 3
132.9 39 121.6 4
132.3 20 119 3 5
131.7 21 120.4 131.1 22 119.6 6
119.0 7
130 5 23 8
129.8 24 118.3 9
129.0 25 117 7 10 128.3 26 117.0 3g 127.7 27 116.4 12 126.9 28 115.7 i
13
, 126.3 29 1:5.1 14 125.6 30 114 4 15 125.1 33 113.9 16 124.4 INSTRUCTIONS On this format. list the average daily unit power leselin SlWe. Net for each day in the reporting month. Compute to the r.esrest whole megawatt.
(9/77) r--
,, w r r 4
DOCKET NO.
50-29 UNITSilUIDOWNS AND POWER REDUCTIONS UNIT NAME Yankee Rowe DATE 810410 COMPLETED llY D. M. Bernard REPORT AIONTil MARCil, 1981 TELEPilONE 617-872-3100 X2390
's w 3 c
re
.3 _::
8 o.5 ~4 Licensce c't.
g7, Cause & Corrective No.
Date g
is g
,g g 5 Event u7 p.3 Action to g3 E 5
3 ;5 c Report #
<N U EO Prevent itecurrence A
.O e
d NONE N/A N/A N/A N/A N/A N/A N/A N/A N/A a
I 2
3 4
F: Fors ed Reason:
Method:
Exhibit G -Instructions S: Stheiluted A Eipiipment Failuie (Explain) 1-Manual for hep. nation of D.ita n Maintenance of Test 7 Manual Scram.
Entry Sheets for I.icensee C Itcrueling 3 Automatic Scram.
Event Itepose (Ll:It) It le INUltEG.
a I;.itegulainiy itestrictioi 4-Oslier (Explain) 01611 E Opciaint Tsaining & License lixamhiation F Adminisis.iiive 5
G Un national I isier Ilimpt.iin)
Exlobit I Same Source 08/17)
Il-Othes (limplain) t
[
~
q 9
+
t DOCKET NO.
50-29 UNIT Yankee Rowe
..DAT_E
_810410 COMPLETED BY D. M. Bernard TELEPHONE 617-872 8100 X2390 REPORT b!ONTH htARCH_ 1981 SU't!ARY OF OPERATING EXPERIENCES 3/20/81 At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> a plant load reduction commenced to perform throttle and control valve exercise'. At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the valve exercise was completed and the plant power level was increased.