YANKEE ATOMIC NUCLEAR POWER STATION
'10NTHLY STATISTICAL REPORT 81-2 FOR THE MONTH OF FEBRUARY,1981 8110060577 810310 PDR ADOCK 05000029 R
4 OPERATING DATA REPORT -
DOCKET NO.
50-29 t
DATE 810310 _
COS!PLETED BY n W Rernard
^
TELEPHONE,
617-872-8100 X239
~
OPERATING STATUS Notes
- 1. Urdt Name:
Yankee Rowe Februarv. 1981
- 2. Reporting Period:
Power level restricted by g
- 3. Licensed Thermal Power (31Wt):
600 installation of baffle 185
- 4. Namepiste Rating'(Gross 31We):
Plates in turbine.
175
)
S. Design Electrical Rating (Net 5fWe):
180
- 6. >!sximum Dependsble Capacity (Gross SIN):
175
- 7. hinximum Dependable Cspacity (Net 5!We):
' 8. If Changes Occur in Capscity Ratings (Irems Number 3 Through 7)Since Last Report. Give Ressons:
150 MWe
- 9. Power Level To Which Restricted.If Any (Net 31We):
See Notes
- 10. Ressons For Restrictions.!f Any:
G i
This 51onth
.Yr..to Date Cumu!stive 672.00 1.416.00
- 11. Hours in Reporting Period 672.00 1.363.13 141.697.41
- 12. Number Of Hours Reactor Was Critical
- 13. Resetor Reserve Shutdown Hours 0.00 0.00 0.00 672.00 1.347.52 137,309.25 l
- 14. Hours Cenerstor on Line 0.00 0.00 0.00
- 15. Unit Reserve Shutdown Hours
- 16. Cross Thermal Energy Generated (31WH) 385,597.00 784.867.00 73,658,'647.81 l
- 17. Gross Electrical Erer;y Genented (51WH) 104,006.00_,
211,489.50 22,596,630.00
- 18. Net E!ectrical Energy Generated (S!WH) 96,676.85 196.776.46 21,154.886.15 100.00 95.16 77.17 I
- 19. Unit Service Factor 100.00 95.16 77.17
' 20. Unit Availability Factor
- 21. Urdt Capacity Factor (Using 31DC Net) 82.21 79.41 70.12 82.21 79.4,1_
70.12
- 22. Unit Capseity Factor (Using DER Net) 0.00 4.84 5.38
- 23. Unit Forced Outage Rate 7
- 24. Shutdowns Scheduled Over Next 6 Sfonths (Type.Date.snd Durstion of Esch1:
A civ-week refnaling nnd mintennnen ehntdnwn is <chndi,1nd en ho gi r, W1 7
- togt, i
i
- 25. If Shut Down At End Of Report Period.Estimsted Ds:: 'Startup:
- 26. Units In Test Ststus O.ior to Commercial Operstion):
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY i.
CG. DIERCIAL OPERATION I
\\
(C/77) i L
i
o AVERAGE DAILY UNIT POWER LEVEL
.i DOCKET NO. 50-29 UNIT Yarikee Rowe DATE 810310
. COMi'LETED BY ' D. M, Bernard.
TELEPHONE 617 R77-8100 X2390 M O'. TH FEBRUARY, 1981 DAY AVERAGE DAILY POWER LEVEL D/.Y AVERAGE DAILY POWER LEVEL
- (MWe-Net)
(MWe-Net)
I 150.1 37 143*.I 2
149.8 gg 142.2 3
150.1 19 141'3 4
150.2 20 123.1 5
150.3 21 142.7 150.3 22 139.3 6
7 150,6 23 138.3 150.6 24 137.8
[
8 136.8 9
'149.8 25 10 149.0 26 136.1 11.
148.2 27
._135.3 147.3 12 2S 134.8 13 146.4 29 14 145.6 30 144 9 31 15 16 144 1 1
i INSTRUCTIONS On this format. list the. verage daily unit power level in MWe Net for each day in the reporting month. Compute to ine nearest whole megawatt.
(9/77)
U
~,,__.l,e,-
y e
y
,n,.,-
,-w--r-
~w-o-w,,
vi
-g
,y-a
--e--~"-
w n
~< - -
--.---m----,-
ne.,
m.
e UNITSilUTDOWNS AND POWER REDUCTIONS DOCK ET NO.-
50-29 UNIT NAME Yankee Rowe a
DAlt 810310 REPORT MONTil FEBRtlARY, 1981 COMPLETED !iY n m nornard TELEPil0NE _6_17-872-8100 X2390 1
% nE
&t Cause & Corecetive c
re
't
.2 g
-,.s y Licensee e -r, g
No.
Date g
3 ij
.g g a:
Eveni u8 93 Action to F
$is 5'
3 di y Report #
Nu gu
. Prevent Recurrence
- u
^
cO None N/A N/A N/A N/A N/A N/A N/A N/A N/A i
i
.i i
j i
2 3
4 i
F: Posted Iteason:
Method:
Extiibii G Instructions
{
S: Scheduled A.Eiinipment Failure (Explain) l Manual for Picparati.m of Data fl Maintenance.i T:a 7 Manusl Scrain.
Entry Sliceis for I.icensee C.Iterocline, 3 Automatic Scram.
Evens 1(epini (Ll!!tl File INUlti'.G.
D.Iteguhiipy l(esitiction 4.Other (Explais.1 01611
- li.Opciator Tiaining & License Exannaation F Ailminiusative 5
l G Opesati.inal 1.ieur (lixplain)
Exhibit I Same Sousee 08/17)
Il Othes (limplain)
o'E*.
DOCKET NO.
50-29 UNIT Yankee Rowe DATE _810310 COMPLETED BY D. M. Bernard TELEPHONE 617-872-8100 X2390 REPORT MONTH ppnnnany_ ing3 SU' NARY OF OPERATING EXPERIENCES 2/9/81 Commenced plant coastdown from 600 MWt (161.1 MWe).
2/20/81 Commenced a load reduction, a? 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, for the turbine throttle valve ' exercise and condenser leak check. At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the throttle valve exercise was. completed and began a further load reduction to conduct the condenser leak check.
At 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> the plant load was 90 MWe and the leak check of the condenser was started.
At 1235 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.699175e-4 months <br /> the leak check was completed, resulting in one tube in the west water box being plugged and commenced load increase.
At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the plant load was 159.3 MWe.'
2/22/81 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Xenon equilibrium was reached, plant load 150.7-MWe.
2/28/81 Maximum operating load 145.3 MWe.