Monthly Operating Rept for Dec 1979
ML20031C134
Person / Time
Site: Yankee Rowe
Issue date: 01/10/1980
From: Siogren R
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20031C129 List:
References
NUDOCS 8110060570
Download: ML20031C134 (5)


Text

... -..

.a

.s 1

}'

YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-12 FOR THE MONTH OF DECEMBER, 1979 i

i i

f i

l I'

i t

9110060570 800110 PDR ADOCK 05000029'

-R PDR A

,/ %

~

OPERATING DATA REPORT DOCKET NO.

50-29 DATE 800110 COSIPLETED BY R. M. Siogren TELEPHONE (617) 366-9011 X2281-OFERATING STATUS Notes

l. Unit Name:

Yankee Rowe December 1979

2. Reporting Period:

600

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross SIWE):

185 175

5. Design Electrical Rating (Net MWe):

180

6. Maximum Dependable Capacity (Gross MWe):

175

,7. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None.

9. Power Level To Which Restricted.If Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

.. ~.

'( -

This Month Yr to.Date Cumulative i

744-8,760

{

11. Hours In Reporting Period
12. Number Of Hours Reactor was Critical 744 7,169.75 138,364.65
13. Reactor Reserve Shutdown Hours 0.0 0.0

-O.0

=

14. Hours Generate.-On.Line 744 7,149.61.

134,'027.61

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 435,186 4,174,777 71,748,322.11 1
17. Gross Electrical Energy Generated (MWH) 138._205 1.311.205.2 22,072.153.2 IF. Net Electrical Energy Generated (MWH) 129,919.199 1,232,262.668 20,666,143.33 l
19. Unit Service Factor 100.0 81.6 79.9 i',.
20. Unit Availability Fac:or 100.0 81.6 79.9
21. Unit Capacity Factor (Using MDC Net) 99.8 80.4 73.1 99.8 80.4 73.1
22. Unit Capacity Factor (Using DER Net) 0.0 2.4 1.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Unscheduled outage to install voltage regulators on the two incoming lines from the high lines and to make TMI* modifications " January 19, 1980--3 weeks.

e r

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved,

e-INITIA L CRITICALITY 4._,

  • INITIAL ELECTRICITY COMM ERCIAL OPERATION

'(9/77)'

AVERAGE DAll f UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rowe DATE 800110 COMPLETED BY R. M. Siegren TELEPHONE (617)366-9011 X2281 Deceder W 9 MONTH

-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

+

(MWe-Net)

(MWe-Net) 174.9 174.9 37 2

174.9 18 174.8 3

174.8 39 174.8 4

174.9 20 174.8 174.8 5

174.9 21 6

174.9 22 174 8 7

167.5 23 174 9 174.8 174*9 24 8

9 174.9 25 174.8 10 174 9 26 174.8 174.8 33 174.9 27 174.8 12 174.8 28 174.9 174.8 29 13 174*9 14 174 9 30 15 174 9

~

174.9 31 16 174.9 INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawstt.

(9/77)

V

f %.

C 4

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-29 UNIT NAhlE Yankee Rowe DATE 800110 i

i REPORT hlONTil December 1979 COhls tETED ilY R. M. Siogren,

TELEPilONE (617) 166-9011 X2281 i

I te E S '1, c

es

.s _e g

g.s X Licensee gg a

g" Cause & Corrective N. i.

Date g

3g

,c g &

Event

=T o-Action to

$E 5

315g Repori

  • SE0 Prevent 1(ceurtence H

e

.O e

i o

None N/A N/A N/A N/A N/A N/A N/A N/A N/A 4

4 4

i t

2 3

4 F: Faited Iteason:

hiethod:

Extiibit G Instructions S: Scheduled A liquipinent Failuse(Explain),

I Manual for l'acparation of Data 4

fl.hlaintenance of Test 7 hlanual Scram, lintry Sheets for Licensee C.itefueling 3-Automatic Scram.

Event Itepuil (LliR) File (NUlt!'.G-D Itegulatu y itestriction 4 01her(IIxplain) 0161) li-Ope ator Tsaining& License Examination I Administrative 5

G Openalinnal I....:(limpi int

('3/ D)

II (Ithei t tixplain)

Exinhit 1 Same Sousee

DOCKET NO.

50-29 UNIT Yankee Rowe DATE 800110-COSIPLETED BY R. M. Sjogren TELEPHONE (617)'366-9011 X2281 REPORT MONTH December 1979 SUSB!ARY OF OPERATING EXPERIENCES 12/7 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> a load reduction was begun to conduct turbine throttle and control valve exercises.

At 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> the valve exercise was commenced. The evolutions were completed at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br /> and load escalation was started.

At 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> the plant was again at full load.

s D

i