YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-12 FOR THE MONTH OF DECEMBER, 1979 i
i i
f i
l I'
i t
9110060570 800110 PDR ADOCK 05000029'
-R PDR A
,/ %
~
OPERATING DATA REPORT DOCKET NO.
50-29 DATE 800110 COSIPLETED BY R. M. Siogren TELEPHONE (617) 366-9011 X2281-OFERATING STATUS Notes
- l. Unit Name:
Yankee Rowe December 1979
- 2. Reporting Period:
600
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross SIWE):
185 175
- 5. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependable Capacity (Gross MWe):
175
,7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
None.
- 9. Power Level To Which Restricted.If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
.. ~.
'( -
This Month Yr to.Date Cumulative i
744-8,760
{
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor was Critical 744 7,169.75 138,364.65
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
-O.0
=
- 14. Hours Generate.-On.Line 744 7,149.61.
134,'027.61
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 435,186 4,174,777 71,748,322.11 1
- 17. Gross Electrical Energy Generated (MWH) 138._205 1.311.205.2 22,072.153.2 IF. Net Electrical Energy Generated (MWH) 129,919.199 1,232,262.668 20,666,143.33 l
- 19. Unit Service Factor 100.0 81.6 79.9 i',.
- 20. Unit Availability Fac:or 100.0 81.6 79.9
- 21. Unit Capacity Factor (Using MDC Net) 99.8 80.4 73.1 99.8 80.4 73.1
- 22. Unit Capacity Factor (Using DER Net) 0.0 2.4 1.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
Unscheduled outage to install voltage regulators on the two incoming lines from the high lines and to make TMI* modifications " January 19, 1980--3 weeks.
e r
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved,
e-INITIA L CRITICALITY 4._,
- INITIAL ELECTRICITY COMM ERCIAL OPERATION
'(9/77)'
AVERAGE DAll f UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rowe DATE 800110 COMPLETED BY R. M. Siegren TELEPHONE (617)366-9011 X2281 Deceder W 9 MONTH
-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
+
(MWe-Net)
(MWe-Net) 174.9 174.9 37 2
174.9 18 174.8 3
174.8 39 174.8 4
174.9 20 174.8 174.8 5
174.9 21 6
174.9 22 174 8 7
167.5 23 174 9 174.8 174*9 24 8
9 174.9 25 174.8 10 174 9 26 174.8 174.8 33 174.9 27 174.8 12 174.8 28 174.9 174.8 29 13 174*9 14 174 9 30 15 174 9
~
174.9 31 16 174.9 INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawstt.
(9/77)
V
f %.
C 4
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-29 UNIT NAhlE Yankee Rowe DATE 800110 i
i REPORT hlONTil December 1979 COhls tETED ilY R. M. Siogren,
TELEPilONE (617) 166-9011 X2281 i
I te E S '1, c
es
.s _e g
g.s X Licensee gg a
g" Cause & Corrective N. i.
Date g
3g
,c g &
Event
=T o-Action to
$E 5
315g Repori
- SE0 Prevent 1(ceurtence H
e
.O e
i o
None N/A N/A N/A N/A N/A N/A N/A N/A N/A 4
4 4
i t
2 3
4 F: Faited Iteason:
hiethod:
Extiibit G Instructions S: Scheduled A liquipinent Failuse(Explain),
I Manual for l'acparation of Data 4
fl.hlaintenance of Test 7 hlanual Scram, lintry Sheets for Licensee C.itefueling 3-Automatic Scram.
Event Itepuil (LliR) File (NUlt!'.G-D Itegulatu y itestriction 4 01her(IIxplain) 0161) li-Ope ator Tsaining& License Examination I Administrative 5
G Openalinnal I....:(limpi int
('3/ D)
II (Ithei t tixplain)
Exinhit 1 Same Sousee
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 800110-COSIPLETED BY R. M. Sjogren TELEPHONE (617)'366-9011 X2281 REPORT MONTH December 1979 SUSB!ARY OF OPERATING EXPERIENCES 12/7 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> a load reduction was begun to conduct turbine throttle and control valve exercises.
At 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> the valve exercise was commenced. The evolutions were completed at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br /> and load escalation was started.
At 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> the plant was again at full load.
s D