YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-06 FOR THE MONTH OF JUNE, 1980 8110060564 000712 PDR ADOCK 05000029 PDR R
-. ~, _., _.
OPERATING DATA REPORT DOCKET NO.
50-29 _
DATE 800712 C051PLETED BY F. C. Beers TELEPHONE 617-366-9011 X2215 O' PERATING STATUS Notes
- 1. Unit Nsme:
Yankee Rowe June. 1980
- 2. Reporting Period:
600
- 3. Licensed Therms! Power (MWt):
185
- 4. Namep!ste Rating (Gross 31We):
175
- 5. Design Electrical Rating (Net.T!We):
180
- 6. $!sximum Dependable Capscity (Gross StWe):
175
- 7. 51sximum Dependable Capscity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
' 9. Power Leve! To Which Restricted. If Any (Net.\\1We):
- 10. Reasons For Restrictions.If Any:
This Month
.Yr..to-Date Cumu!stive 720.00 4.367.00
- 11. Hours In Reporting Period 0.00 445.77 138,810.42
- 12. Number Of Hours Reactor was crit:c,!
~
0.00 0.00
-0.00
- 13. Reactor Resene Shutdovm Hour:
- 14. Hours Generator On Line 0.00 439.70 134,467.31
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (51WH)
'O.00 253.769.00 72,002;091.11 0.00 80,635.00 22,152,788.20
- 17. Cross Electrical Ener;y Genemted (MWH) 13.' Net E!ectrical Energy Gerierated (StWH) 0.00 75.748.88 20.741,892.21 0.00 10.07 78.13
- 19. Urdt Service Factor 0.00 10.07 78.13
- 20. Unit Availability Factor
- 21. Urdt Capacity Factor (Using.\\f DC Net) n.nn 9.91 71.15 0.00 9.91 71.15-
- 22. U. it Capscity Factor (Using DER Net) n no 86.85 3.69
- 23. Unit Forced Out::ge Rate
- 24. Shutdowns Scheduled Over Next 6 51onths (Type.Date.snd Duration of Each1:
t
- 25. If Shut Down At End Of Report Period.Estima:ed Date of Startup:
- 26. Units in Test Status (Prior to Commerei:1 Operation):
Forecast Achieved i
INITIA CRITICALITY INITIA L ELECTRICITY I
COM31ERCIAL OPER AT!ON I
(C/77)
, -.. -. ~. -
m o
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rove DATE 30fG712 f
C051PLETED BY F. C. Beers TELEPHONE 617-366-90:1 X2215
>!ONTH JUNE 1980 DAY AVERACE DAILY FQWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)
(blWe Net) 0.0 0.0 1
37 2
18 3
19 4
20 S
21 6
22
(~
-7 23 8
24 9
25 10 26 11 27 12 2S 13 29 14 30 V
I5 31 16 V
1 INSTRUCTIONS On this forr.at. list the average daily unit power levelin SIWE Net for each day in the reporting month. Compute to the nearest v.he'e megawatt.
V, (9/77)
+
r------
r w--
3.
y
-. ~.
l DOCKET NO.
50-29
. UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAhlE Ynnkee Rowe l
DATE 080712 REPORT AIONTil JUNE 1980
. COh!PLETED ItY F. G.
Beers
. TELEPilONE 617-366-9011 X2215
.g
'3 us a II e
ci No.
Date E.
j 1 y "I!
h}$
Cause & Corrective C"5 C R
9o Action to VC"8 s
Bj U-
-5 a
$ E5 h NCP"II #
"U U
Pievent llecutience O-i 6
1 1/19/80 S
720 A
1 N/A N/A N/A The plant is shut *down for turbine rotor repair and other plant mainten-ance work.
i i
i 1
I I
2 3
4 F: Furt est Iteason.
Exhibit G. !nstructions' S: Scheilutett A.Eigui;5 ment Failure (Explain) 3[ t I"' IP'""n of Da t a Il41aintenance or Test 7.p t3""3 Cutn.
Enuv Socess foi 1.ieensee C*1(cruel 8"l*
- 3. Automatic Scram.
Eves.: 1(epint (Lliiti File INUltEG.
g eg;ulainiy llesitiction 4.Other (limplain) 0161) li Opciator Tsainin;la License Exainination j
F Aihniniueative i
G Opesational lacus (lixplain)
Exhibit I Same Somee Pi/17)
Il Othes (!!xiel.iin) e e
~
r DOCKET NO.
50-29 UNIT Yankee Rowe a
DATE 800712 COMPLETED BY F. C. Beers TELEPHONE 617-366-9011 X2215 Rb 2RT MONTH JUNE 1930
- SU: NARY OF OPERATING EXPERIENCES The plant remained shut down for the entire conth, in mode 5, due to turbine disc f ailure and other plant maintenance work.