r APPENDIX A NOTICE OF VICLATION Philadelphia Electric Company Docket No. 50-352 Limerick Generating Station Unit 1 License No. CPPR-106 As a result of the inspection conducted on August 1-30, 1981, and in accordance with the Interim Enforcement Policy, 45 TR 66754 (October 7,1980), the following violation was identified:
10 CFP. 50, Appendix
, Criterion V, states, in part, that: " Activities affecting quality shall-be... accomplished in accordance with these instruc-tions, procedures. or drawings."
The timerick PSAR, Appendix D, Paragraph 6.4, states, in part, that:
"Bech-tel Construction Department...is respon:,1ble for construction of the plant to approved engineering-specification..."
General Electric Specification 22A2517 Revision 1 Paragraph 4.3.5.3 states, in part, that:
"For heated vessels, the temperature of the heated surfaces shall be checked at three equally spaced locations at leas. once a day..."
The Bechtel Maintenance Log for the Unit No. I reactor pressure vessel,-
dated September 13, 1976, and the Supplensint Sheet, dated !! arch 30, 1979, require daily tenperature readings be taken ou the reactor pressure
~
vessel.
Contrery to the t'Jove, during the period of April 13 to approximately August ~
14, 1981, daily temperature readinp were not taken on the Unit No. 1 reactor pressure vessel.
This is a Severity Level VI Violation (Supplwent II). Corrective actions were implemented and completed before August 30,1981. No response to this violation is necessary.
SEP 111981
~~
Dated R. R. Xefmig, CTfef Projects Branch f2 Division of ' Resident' and Project
. Inspection
^
hDNO O!bbobb2 0FFICIAL RECORD COPY G