Answer Supporting NRC 810910 Motion for Summary Disposition of Contention 10.No Genuine Issue of Matl Fact Exists.Nrc 60% Assumed Capacity Factor Conservatively Underestimates Expected Facility Capacity.Related Correspondence
ML20031B672
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/29/1981
From: Traviesodiaz
ALLEGHENY ELECTRIC COOPERATIVE, INC., PENNSYLVANIA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20031B673 List:
References
NUDOCS 8110050380
Download: ML20031B672 (2)


Text

..

d Septembsr 29, 1981 a

!!EIEDQ ROIutESNNDisN!N UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION csMJI/. /f BEFORE THE ATOMIC SAFETY AND LICENSING BdMkD (

k[{

w liLot L'

In the Matter of

)

h CCI 3 1931 *

)

y. ;.. r. m a.-

PENNSYLVANIA POWER & LIGHT COMPANY

)

cc-m *

)

i and

)

Docket Nos.,50-387--

s

)

150-388'*

ALLEGHENY ELECTRIC COOPERATIVE, INC. )

, -m.

)

/ :,Q (Susquehanna Steam Electric Station, )

Units 1 and 2)

)

g Y

NRC STAFF MOTION FOR

!.~,

f.

APPLICANTS' ANSWER TO g-g3}

!j

SUMMARY

DISPOSITION OF t 'l 9

//

CONTENTION 14 Sv

/

L On September 10, 1981, the NRC Staff filed a Motion for Summary Disposition of Contention 14.

The motion was supported by the Affidavit of Raghaw Prasad, an economist with Argonne National Laboratory.

Accompanying the motion was a Statement of Material Facts As To Which There Is No Genuine Issue To Be Heard.

Applicants support the Staff's motion.

The Staff finds that the historical capacity factors for all U.S. nuclear reactors is 61.8% and the estimated average capacity factor for an 1100 MW boiling water reactor to be gp3 5

65%.

Although these values are lower than the 70% capacity factor assumed in Applicants' Environmental Report - Operating

[

l License Stage ("ER-OL"), the Staff concludes that the savings from operating Susquehanna, even assuming a 60% capacity factor, are much higher than those projected in the ER-OL and that the benefits of operating Susquehanna outweigh the costs.

81*0050380 810929 PDR ADOCK 05000387 O

PDR

,-------.-w m--,a e

--,<n-

,,n--

-,.--w,

___ - =_.______ -_

. _.. _. = _ _ - _ -

i 1

Applicants have performed their own detailed analysis l

l of the capacity factors to be expected from the Susquehanna units.

l This analysis, set forth in the attached Af fidavit of Robert H.

l Koppe, shows that capacity factors of about 60% for the first j

four years of operation and 70% thereafter are prudent estimates for the performance of the Susquehanna Units.

Thus, Mr. Koppe's analysis shows that the 60% capacity factor assumed by the Staff conservatively underestimates the expected capacity factor for Susquehanna.

For all these reasons, Applicants respectfully request that the Licensing Board grant the NRC Staff's motion for summary disposition of Contention 14.

Dated:

September 29, 1981.

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE k

A$< pit {

Jay E.

Silberg Matias F. Travieso-Diaz l

Counsel for Applicants 1800 M Street, N.W.

Washington, D.C.

20036 Telephone:

(202) 822-1000 l