ML20031B314

From kanterella
Jump to navigation Jump to search
Discusses Operational Radiological Monitoring Program Which Is Presently in Compliance W/Branch Tech Position Requirements.One Air Sampler Serves Two Locations.Util Will Increase Number of Air Samplers to Five
ML20031B314
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/28/1981
From: Colbert W
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
EF2---55-024, EF2---55-24, NUDOCS 8110010219
Download: ML20031B314 (1)


Text

.

\\

A %t,,

'l Detroit ~

'/s Edison Riis!="

3 > e, o,Y,,

Es S

6 September 28, 1981 EF2 - 55,024 a

lir. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555

Dear Mr. Kintner:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Doci:et No. 50-341

Subject:

Operational Radiological Monitoring Program Detroit Edison has reviewed the tentative Operational Radiological Monitorlng Program with respect to the requirements of ths Branch Technical position (BTP),

Revision 1, November 1979 The program is presently in compliance with the BTP requirements in that one air ~ sampler serves two locations:

highest annual average ground level D/Q and the community having the highest D/Q.

However, Edison will add an additional air sampler in l

a location to be selected by Edison to bring the total number of samplers to five.

Edison will be conducing a land use survey in early 1982 to determine the location of milk producing animals.

Sampling will be conducted as recommended in the Branch Technical Position.

Sincerely, I

hY4h 3L-W. F. Colbert k$0 DOI Technical Director 5

Enrico Fermi 2

/ t)

WFC:jl Attachment cc:

Mr. B. Little lfjoO1021981092g 4

ADOCK 05000041 PDR