ML20031B309

From kanterella
Jump to navigation Jump to search
Responds to 810908 Request for Info Re Facility OL Status. Const Deferral of Unit 2 Confirmed.Ol Cannot Be Issued Until All Findings in 10CFR50.57 Are Satisfied
ML20031B309
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 09/22/1981
From: Bordenick B
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Falkenheiner D
PUBLIC LAW UTILITIES GROUP
References
NUDOCS 8110010209
Download: ML20031B309 (1)


Text

-

-+-

O Q

()

cf gr.

t?'"g.#

e p

Distribution:

NRC Centiel Files 0 ELD Formal Files (2)

September 22, 1981 Shapar/Engelhardt Christenbury/Scinto Olmsttad h ) p rn

[K ~,/

\\

/

Reis Bordenick Dewey its. Doris Falkenheiner. Directo Public Law Utilities Group 8

M LJ c2.

A. Schwencer 116C

)

53a Horth oth Street L,

SEP3 01981. ;

D. Hood 116C Baton Rouse, Louisiana 70802 {

m,,,

N b

v

Dear lis. Falkenheiner:

m m

Your letter dated September 6, 1931 addressed to the Cnief Hearing Counsel has been referred to ne fer reply.

Your letter referenced the Federal Register notice of Septenuer 4,1961(46 Fed, keg. 44539) which states, in part, that Gulf States Utilities (GSU) has applied for an operating license for River Bend Station Units 1 and 2.

Your letter inquired, in view of GSU's past announceoent of an indefinite deferral of construction regarding Unit 2, whether bSU had in fact applied for an operating license for Unit 2 or unether there was an error in the above-referenced notice.

GSU has applied for operating licenses for both Units. Accordingly, the Federal Reuister notice referenced in your letter is correct. However, an operating license for Unit 2 cannot be issued by this Corr.11ssion until all the findings in 10 C.F.R. 9 50.S7 have Deen uade by the Connission, including but not limited to the finding required by s 50.67(a)(1) tnat

[cjonstruction of the facility has been substantially completed in conformity witn the construction permit and the application as duended, the provisions of the [ Atonic Energyj Act and the rules and regulations of the Cor.nission Li.e. 10 C.F.R.]

If the deferred Unit 2 is eventually conpleted by GSU, and all applicable Cocuisston regulations are satisfied, Unit 2 would be eligible to receive an operating license at a later time than Unit 1.

If construction of Unit 2 is not conpleted then, of course, that Unit would not be eligible for an operating license.

Sincerely, Bernard 14. Bordenick, Attorney C '110010209 810922 Office of the Executive Legal Director 8PDR ADOCK 05000458 H

PDR hg*

<.0E LD / /........

'..... 6 /...ff......

omer pELD 0 ELD f

.s..... /.....

c.gg............4....

b EReis JScinto cur m apamch:s om>..h..h.k..')..bi."..~...