Application to Amend License NPF-2,changing Tech Specs to Incorporate TMI-2,Category a Items
ML20031B298
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/25/1981
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20031B299 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8110010196
Download: ML20031B298 (3)


Text

{{#Wiki_filter:- Molling Address Alabama Pomi Company 600 North 18.r Str et Post Ofhce Box 2641 Birm:ngham, Alabama 35091 Telephone 205 783-6081 F. L. Clayton, Jr. b C o' % P g nt Alabama Power September 25, 1981 "'" m " * " d # c 3 *

  • Docket No. 50-348 g

l 6 J j SEP3 0 I98Ib C l Director, Nuclear Reactor Regulation 2 U. S. Nuclear Regulatory Commission Lg -{"%pq Washington, D. C. 20555 b Attention: Mr. S. A. Varga s n Gentlemen: Re.: (1) D. G. Eisenhut's letter to All PressurizedS Water Reactor Licensees, dated July 2, 1970 (2) APCo letter to NRC (F. L. Clayton, Jr. to S. A. Varga) dated December 15, 1980 (3) APCo letter to NRC (F. L. Clayton, Jr. to S. A. Varga dated May 28,1981) (4) APCo letter to NRC (F. L. Clayton, Jr. to S. A. Varga dated September 22,1981) Joseph M. Farley Nuclear Plant - Unit 1 Change to Facility Operating License NPF-2 Technical Specifications In reference (1) the NRC requested that Ai;bama Power Company submit { propcsed changes to the Farley Unit 1 Technical Specifications to satisfy the Category "A" item requirements resulting from TMI-2 Lessons Learned. Alabama Power Company's letter of August 7, 1980 to Mr. D. G. Eist..P.ut stated that Alabama Power Company would respond to these specification requirements for Unit 1 following receipt of the Unit 2 operating license as part of the Unit 1 Technical Specification Upgrade. In Reference (2) Alabama Power Company provided the Technical Specifications necessary to satisfy the January 1,1981 requirements of NURF.G-0737. Although the Unit 1 Technical Specification Upgrade was originally scheduled for June 1981, negotiation of some items in the upgrade package has delayed its issuance to early November 1981. Alabama Power Company hereby requests an amendment to Farley Nuclear Plant Unit 1 Technical Specifications to incorporate the TMI-2 Category "A" items into the Unit 1 Technical Specifications. Attachment 1 to this letter is a cross reference between the Category "A" Model specification provisions of Reference (1) ano sections in the existing and proposed Technical Speci-fications which show compliance with these requirements. Attachment 2 contains the proposed Category "A" Technical Specification pages originally submitted in Reference (2) which have been modified to incorporate changes submitted in Reference (3) and Reference (4). W 0 1 [ *OgI h D 8110010196 010925 DR ADOCK 05000349 p PDR g,

Director, Nuclea: Reactor Regulation September 25, 1981 U. S. Nuclear Regulatory Commission Page 2 The Plant Operations Review Committee and the Nuclear Operations Review Board have revicad the above proposed changes and have deter-mined that the revisions do not involve any unreviewed safety issues as shown in the safety evaluation submitted in Reference (2). This item is designated Class III according to 100FR170 requirement;. A check for $4,000.00 is enclosed to cover the fees required. In accordance with 10CFR503(c)(1)(i), three (3) signed originals and thirty-seven (37) additional copies of the proposed amendment are enclosed. If you have any questions, please advise. Yours very trul", F. L. Clayton, Jr. FLCJr/WGW:de Enclosures SWORNTOANDSyBSCRIBEDBEFORE ME THIJ d5,t:A DAY OF cc: Mr. R. A. Thomas _&)4&dw , 1981. Mr. G. F. Trowbridge / Mr. J. P. O'Reilly ? jj Mr. E. A. Reeves Mr. W. H. Bradford 2dw p. #44eo (f Notary Public My commission expires: 7- /q-g t

TMI - LESSONS LEARNED CATEGORY A ITEMS Note: Unless identified by an asterisk, the APCo Technical Specification listed is the current NRC issued Unit 1 Technical Specification. Model Technical Specifications APCo Technical Specification Identified in NRC letter of

  • - Denotes Proposed Technical July 2, 1980 Specification Change 3.4.4*, 3.8. :.1 and 3.8.2.2 (Power suppl {'"*

1. 3.4.4 1. E **" **" ***

  1. 8"S*I 2.

3.4.3 2. 3.4.4.a* 3.8.2.1 and 3.8.2.2 (Power supply for PORV Block Valves) 3.8.2.3 and 3.8.2.4 (Power supply for PORVs) 3. Table 3.3-10 and 3. Table 3.3-11* and Table 4.3-7* Table 4.3-7 4. Table 3.3-3 Item 3 4. Table 3.3-3 Item 3 5. Table 3.3-4 Item 3 5. Table 3.3-4 Item 3 6. Table 4.3-2 Item 3 6. Table 4.3-2 Item 3 7. Table 3.6-1 7. Table 3.6-1 8. Table 3.3-3 Item 6 8. Table 3.3-3 Item 6, 3.7.1.2 9. Table 3.3-4 Item 6 9. Table 3.3-4 Item 6, 3.7.1.2

10. Table 4.3-2 Item 6
10. Table 4.3-2 Item 6
11. Table 3.3-5
11. Table 3.3-5 12.

3.7.1.2 12. 3.7.1.2

13. Table 6.2-1 13.

Table 6.2-1*, 6.2.3.1* 14. 6.3.1 14. 6.3.1*, 6.2.3* Note: Each power operated relief valve (PORV) is equipped with two solenoid valves. These solenoid valves are powered from the class lE 125V D.C. power system. Technical specifications are provided for the class lE D.C. power system in sections 3.8.2.3 and 3.8.2.4. The pressurizer block valves received their power from motor control centers via one of the emergency load centers. Technical specifications are provided for the emergency load centers in sections 3.8.2.' and 3.8.2.2. The pressurizer level transmitters receive power from the 120V A.C. vital buses. Technical specifications are provided for the 120V A.C. vital buses in sections 3.8.2.1-and 3.8.2.2. - -}}