ML20031B156
| ML20031B156 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 09/08/1981 |
| From: | Vaughan C GENERAL ELECTRIC CO. |
| To: | Crow W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20031B157 | List: |
| References | |
| 19645, NUDOCS 8109300425 | |
| Download: ML20031B156 (2) | |
Text
.
yo- //f3 g
~
R A L ELEOTRIC
.nuCte,R energy,2.1.2 DOCE"D
' PRODUCTS DIVISIOD.
usne 2 31981
- k U
2ks STLC HAYNF H0 [
P. O. BOX 780. WI LMINGTON. N. C. 2S402. (919) 343-S00C DEPARTMENT stEE8 -
U
'81 U h 18 N9;i5 g
ootmctIM september 8, 1981 LIC. FE i' S
~
7 *.V
~ -,.,-
7_
7 Office of Nuclear Materials Safety & Safeguards
'f"' 2 C
- ........... 7 m
U. S. Nuclear Regulatory Commission "0
1f[Oh.f Washington, D. C.
20555
'* * /Y'dPMueur).7(k. h/5 T1?0 of Fec. p.- '
Attention:
Mr. W. T. Cr,w, Section. Leader Date Check R,ap'd,,9ff Received By....,c Uranium Pro':ss Licensing Section j_
Dear Sir:
g
Reference:
NRC License SNM-1097, Docket #70-1113
Subject:
USE OF NEUTRON ABSORBERS FOR CRITICALITY CONTROL (Application Amendment N14)
With reference to activities authorized by SNM-1097 at the General Electric Company Wilmington Manufacturing Department, GE hereby requests authorization for the use of neutron absorbers in criticality control.
NRC License SNM-1097 currently allows calculative methods for criticality analysis to be used for establishing the appropriate safety limits of defined processes and operations (reference,w g3 4. g Section 5.2.1 and Appendix A-5.1.5).
However, the neutron y
t,9 absorber subject is not specifically addressed in the existing, g e.
e license.
- N gP
'9Y ftof On Ma.y 27, 1981, GeneralElectricsubmittedtotheNRCah 3 pgp application for renewal of License SNM-1097 which includeg Tv h) w.
q provision for the use of noutron absorbers in Section 4. b,
3.
In support of this amendment request, the following is att $Npd: UN
/
&~& Q'a\\[/
o - A criticality safety analysis which uses the GEMER Monte Carlo code to evaluate the effectiveness of cadmium as a primary criticality control for the GE rad waste / quarantine tanks.
o - A technical report for the project that provides desertptions of the fuels manufacturing operation's rad waste / quarantine tank system, its use and the cadmium panel assemblies.
o - The recommandro wording for the requested amendment to our current license as it appears in Sections 4.2.2.5 and 4.2.2.6 of the 5/27/81 license renewal application.
/h1093OO425 8109083 ja
~
hPDR ADOCK 07001113 d
40 1C PDR e.
s;Q
'O*
S EN ER AllC E LECTRIC l Director - ONMSS September 8, 1981 _
Page 2 Pursuant to 10 CFR 170.31, enclosed is a General Electric check for $1,400 for processing this mmendment request.
General Electric personnel would be pleased to discuss this Erequest with you and members of your staff as you deem necessary.
Very truly yours, GENERAL ELECTRIC COMPANY Charles M. Vaughan, Acting Manager Licensing & Compliance Audits M/C J26 CMV:bmw Attachments