ML20031B127

From kanterella
Jump to navigation Jump to search
Forwards Std Order for DOE Work, Socioeconomic Impacts of TMI-2 Processed Water Disposal Alternatives
ML20031B127
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/16/1981
From: Snyder B
Office of Nuclear Reactor Regulation
To: Fremling A
ENERGY, DEPT. OF
Shared Package
ML20031B128 List:
References
CON-FIN-B-2366 NUDOCS 8109300206
Download: ML20031B127 (2)


Text

- _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l i

SEP 161m

/

QP'STRIBUTION:

Wocket File 50-320 TMIPO R/F 4 6Mfm NRC PDR TMI Site R/F 0

g # poi Q LPDR B. Snyder TERA L. Barrett w/{]

0. Lynch y

og

!!r. A. G. Frenling, itanager p.e B. Grenier Q[,y q.g Richland Operations Office R. Weller g g.q dN; U. S. Ocpartnent of Energy D. Brinkman P. O. Box 550

,]A t

I'd Richland, Washington 99352 B. Applebaum-Weiss a@, y.W d

E W. Travers

Dear fir. Frenling:

hh M

/

SUBJECT:

PNL TECH!!ICAL ASSISTAfiCE TO THE THREE !!ILE ISLAND PROGRN1

"'[f) B ' '

0FFICE, f!RR, !!RC, "SOCIOEC0fl0f TIC IMPACTS OF T11I-2 PROCESSED UATER DISPOSAL ALTERilATIVES" (FIf! f'0. B-2366)

The enclosed flRC Formi 173, Standard Order for DOE Ucrk, is hereby subnitted in accordance with Section III, B.2 of the DOE /NRC !!cnorandun of Understanding dated February 24, 1978.

Funding authorization in the anount of $10,000 to innediately begin work on the enclosed Statenent of Uork, which has been discussed wi %

!!r. J. W. Currie of Ptil, is provided herein. The balance of funds required for project conpletion will be provided increrentally after receipt of an acceptable proposal.

Standard teras and conditions for flRC work, as provided in the DOE /ftRC l'enorandun of Understanding of February 24, 1978, and described in NRC fianual Chapter 1102, should be used as the basis for preparing a proposal.

If a portion of this work is to be subcontracted, it is required that PUL have a professional assigned to the contract who is cualified to defend the results. Also, priot-approval by ne ir #riting is required before initiation of any subcontractor effort.

P'. ease submit a proposal containing, as a nininun, the information set forth in Enclosure 3, Proposal Content, in the fornat of the Statenent of Work within 30 days to:

Bernard L. Grenier Technical Assistance Progran Manager Office of !!uclear Reactor Regulation, P-415 U. S. Nuclear Regulatory Connission Washington, D. C.

20555 If you have any questions, please contact B. L. Grenier on FTS 492-8041.

Sincerely, f

(I\\

Bernard J. Snyder, Progran Director s

Three !!ile Island Progran Office n \\g D

  • SEE PREVIOUS SHEET FOR CONCURRENCE Office of f(ucle.ar Peactor4Reculatio

,,,,,,,,,,,[,),),,,,,,

,,,,,,,,,,,I

,,,TMPhRR, JjIP0:

T

-m

..Ew1osurea suauwe >

...M.0..ncx.t..m C..

?Y69300206 B109i5 Ec f 20m 0200 OFFICIAL RECORD COPY usam e-mm

4 8

SEP'lSISSI

Enclosures:

1. - NRC Fom 173
2. : Statement of Work 3.! Proposal Content-cc:

R. Barber, HQ-DOE R. I. Smith, PNL G. Turner, PNL omcap sun =4m)

,i,,,,,,,,,,,,,,,,,

oare >

3 NRC FORM 318 00@) NRCM mo OFF1ClAL RECORD CO. PY us w. m i m.

n