f.
Radiological safety g.
Mechanical engineering h.
Electrical engineering i.
Administrative controls and quality assurance practices j.
Environment k.
Civil /Struwtural Engineering 1.
Nuclear Licensing m.
Emergency Planning n.
Other appropriate fields associated with the unique characteristics of a nuclear power plant MEMBERSHIP 6.5.2.2 The SRC shall be composed of the following voting members:
Chairman:
Director-Nuclear Design and Analysis Vice-Chairman:
Vice President-Quality Assurance, l
Member:
Manager-Nuclear Technical Support Member:
Manager-Radiciogical Health and Safety
[
Member:
Senior Vice President-Nuclear Generation Member:
Director-Electrical Design and Analysis Member:
Director of Environmental Programs Member:
Director-Civil /Struccural :;3 sign and Analysis Member:
Director-Mechanical Design and Analysis Member:
Senior Inservice Inspection Engineer-Nuclear Technical Support Member:
Manager-Nuclear Licensing Member:
Senior Nuclear Engineer-Design and Analysis Member:
Manager-Nuclear Operations Member:
Director-Piping and Process Design and Analysis AISERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chairman; however, no more than two alternates shall participate as voting members in SRC activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.
MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per calendar quarter during the initial year of facility operation following initial fuel loading and at least once per six months, thereafter.