Ack Receipt of Informing NRC of Steps Taken to Correct Nonconformance Noted in QA Program Insp Rept 99900059/81-01.Requests Addl Info Re Actions Taken to Assure Future Compliance of Welding Personnel
ML20031B081
Person / Time
Issue date: 07/10/1981
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lynam G
AMETEK, Paragon Energy Solutions, INC.
Shared Package
ML20031B066 List:
References
REF-QA-99900059 NUDOCS 8109280565
Download: ML20031B081 (2)


Text

,

o JUL 101981 Docket No. 99900059/81-01 l

Ametek, Incorporated Schutte, Koerting Division, Bethayres R1 ant ATTN: Mr. G. Paul Lynam Vice Pmsident and General Manager 2381 Philmont Avenee Bethayres, PA 19006 I

Gentlemen:

Thank you for your letter of June 5,1981, in response to our letter dated May 6,1981. As a result of ra review, we find that additional information is needed on the following items in the Notice of Nonconfomance:

F.

In your cover letter you have stated that when the units are returned to theffield they will adhere without qualification to the Section III Code and customer requirements. We do not agree that the actions taker, by you in regard to this item are in compliance with that statement, in that you are basically l

proposing to re-ship unitt which contain welds made from materials that have not been tested -in accorddanoewith either Section III of the ASME Code, or your sustomer requirements.

We do not concur that a total of two lateral expansion values is sufficient data to permit a technical judgment of probable adequar,y of noten ductility properties in the affected welds. You am, therefore, requested to provide us with either a corrective action statement addressing the method by which the adequacy of notch ductility properti6s in affected welds will be serified, or, fomal evidence of a waiver by your customer of the Charpy-V impact test requirements.

8109280565 810814 PDR GA999 EMVAMET 99900059 PDR omc'>.BJ.V.....h...S C':.M....)A.

..... ~ ~...Nb -

..~~.4

. -. - ~

..~ ~.

CI:RIS BC:VIB D:E&p sum c> HWRoberds/rf IBarnes " '

'UPotapats'"

"JEGdg71aYd0 '

, dlTihr""

"'> ?/.?/.81......

. 7/.7. /.8,1.,....

. 7/. 7 /.0.1.......

. 7/. [./B.1......

- @. /B1.......

..... ~.

NRC FORM 318 (10-tsO) NRCM O240 OFFlCIAL RECORD COPY

r

-3 o

g..--

y,_.-.;.- m,,7 r

s s:

mf cc ~ + g;g Ametek, Inc.

Dochet No. 9990059/81-01 8.

Please identify what documented actions have been taken to assure 5

future compliance of welding personnel with the requirements of welding procedure specifications.

Please provide this additional infomation within 25 days from the date of this letter in o> ier that we may complete our review.

Sincerely,, p 3 signe

'[p"((3povS* '

Uldis Potapovs, Chief Vendor Inspection Branch bcc:

NRC:PDR JEGagliardo NRCardner HWRoberds i

07mcr>