ML20031A893

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 81-02 Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure. No Westinghouse Electro-Mechanical Div Type Valves Installed or Maintained as Spares at Facility
ML20031A893
Person / Time
Site: Davis Besse 
Issue date: 09/18/1981
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-2-18, IEB-81-02, IEB-81-2, IEB-81-2-S1, NUDOCS 8109280361
Download: ML20031A893 (2)


Text

TOLEDO

%m EDISON R04AHO P. CHOUSE Vice Prescent Docket No. 50-346

[ghy E

rod[fg ps[ y,"2h[

License No. NPF-3 sy z

' c,

fok,

/

'l Serial No. 1-218 D

8 2a 4 i

s 3

A

{. ;i p' c. ;,j

-.I September 18, 1981 I-

%: A't?,

.q d

T't g

Mr. James G. Keppler j

Regional Director, Region III f # r; 4~"gP l

Office of Inspection and Enforcement United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter is in response to IE Bulletiu 81-02 Supplement 1 (Log 1-536) concerning Failure of Gate Type Valves to Close Against Differential Pressure (W-EMD type).

Toledo Edison has identified that there are no W-EMD type valves installed or maintained as spares for Davis-Besse Nuclear Power Station Unit No. 1 (DB-1).

Toledo Edison's manpower expenditures for IE Bulletin 81-02 Supplement 1 are as follows:

REVIEW AND PREPARATION OF REPORT -

6 manhours CORRECTIVE ACTION -

O manhours l

l Very truly yours, ff fM/

pil RPC:PNC: lab cc: Director of the NRC Office of Inspection and Enforcement Washington, D.C.

20555 1

DB-1 '?RC Resident Inspector l

l j

THE TOLEDC PDISON COMPANY EDISON PLAZA 3'1 MADISON AVENUE TOLEDO OHIO 43652 l

8109080361 810918 PDR ADOCK 05000346 SEP 21 1981 n

PDR

I o

ATOMIC ENERGY ACT OF 1954 SECTION 182a SUBMITTAL IN RESPONSE FOR THE DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 FACILITY OPERATING LICENSE NPF-3 This letter is submitted in conformance with Atomic Energy Act of 1954, Section'182a relating to Mr. Keppler's letter of August 18, 1981 (Log No. 1-536).

By:

[

Dirftor, Nucle 6rEngineeringa.4d Construction For:

R. P. Crouse Vice President, Nuclear day of September 1981.

Sworn to and subscribed before me this l

By-(/

Notary'Public LAURIE A.GRUDZINSKI Ngtery Public State of M My Commission Empires May 16,1986 i

i j

l

.,e-

.c.-

. ~.,.. -.

,-y.+_- - -,,

,.