Text
t 9/24/81 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of p,
\\f METROPOLITAN EDIS0N COMPANY, ET AL.)
Docket No. 50-3 0LA -!%
e
.g A
)
g (Three Mile Island Nuclear Station,)
gy fp [n hQ h Unit 2)
)
a g; c, N r a-Y(
8 ~@ Cyf :.,g b-NRC STAFF NOTICE OF ISSUANCE OF MODIFICATION 0sp' 0F ORDER AND MOTION TO REVISE PROPOSED f
TECHNICAL SPECIFICATIONS IN ACCORDANCE THEREWITH
_ s j ifh On September 23, 1981, the Director of the NRC's Office of Nuclear Reactor Regulation issued the attached Modification of Order, pursuant to his authority under 10 C.F.R. 9 2.717(b), which modifies requirements imposed by his Order of February 11, 1980, to allow the Licensee to open both doors of the containment air locks simultaneously to permit the passage of tools and equipment which would not fit between the two doors.
The Modification is supported by the Safety Evaluation attached to it.
Proposed Technical Specification 3.6.1.3, pending before this Atomic Safety and Licensing Board as part of the Operating License Amendment proceeding, presently contains the requirement which the Director's Order has revised, namely, that at least one door of the containment air locks be closed at all times.
Based upon the Director's Modification of Order and the supporting Safety Evaluation, the NRC Staff hereby moves the Licensing Board, subject to its authority under 6 2.717(b) to later modify the proposed Technical Specification, to revise proposed Technical l
po
/MMM RGNE' bS$ko!oOO520 PDR Certiflod By dm
Specification 3.6.1.3 so as to make it consistent with the modified requirement imposed by the Director. This will assure that the Licensing Board has before it for approval the presentiv effective requirements imposed on the Licensee.
All of the parties to this proceeding (the Licensee, the Environmental Coalition an Nuclear Power, and Dr. Lochstet), have been contacted by Staff counsel and do not oppose the grant of this motion.
Respectfully submitted, N. kl
\\
A s
Stephen H. Lewis Counsel for NRC Staff Dated at Bethesda, Maryland this 24th day of September, 1981.