ML20031A769

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1113/81-09 on 810807-11.No Noncompliance Noted.Major Areas Inspected:Physical Inventory Observation. Details Withheld (Ref 10CFR2.790)
ML20031A769
Person / Time
Site: 07001113
Issue date: 09/03/1981
From: David Jones, Lankford J, Mcalpine E, Richards B, Todd G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19303A174 List:
References
70-1113-81-09, 70-1113-81-9, NUDOCS 8109250394
Download: ML20031A769 (1)


Text

-_

' Y *'

MATERIAL TRANSY{TTFD FPr"mi

.g#

NU eiusNON g

REGION 11 5

y 101 MARIETTA ST., N.W., SulTE 3100 ATLANTA PEORGIA 30303 0,

$,4

  • ,..+

3 Report No. 70-1113/81-09 Docket No. 70-1113 Lictnse No. SNM-1097 SaTeguards Group No. III Licensee: General Electric Company P. O. Box 780 L

Wilmincton, NC 78402 Date of Inspection: August 7-11, 1981 Type of Inspection: Unannounced Material Control Accountability Inspectors:

[il p!

_f[3 I/

G.

' lodd, Auditor Date figned S

1.

D.W.p &

nes, Statistician Date signed

'/N @ _-

9/3/? /

J. B. L nkford, ditor

Date Signed 6.d. MM 9/3/W/

B. Richards, Statistician Date ' Signed Approved by:

8@' @ L ' s

?[3/fr i E. J. MMlpine, ChiW, Material Control and Date Signed Accountability Section, Technical Inspection Branch Division of Engir.eering and Technical Inspection Inspeccion Summary Areas inspected:

Physical Inventory Observation.

The inspection involved 144 inspector-hours by 4 NRC inspectors was begun during the regular hours Results: The licensea was found to be in compliance with NRC requirements in the one area examined during the inspection.

5-72 Copy

-j of s

. PaSe3 Copios This Doc _ent is not t um approVA of IE:IIreproduced withou o be c

a 09 4

f0 C

---'