ML20031A310
| ML20031A310 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 11/26/1980 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Bickwit L, Dircks W, Hanrahan E NRC OFFICE OF POLICY EVALUATIONS (OPE), NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| Shared Package | |
| ML20031A308 | List: |
| References | |
| FOIA-80-562 M801114, NUDOCS 8109220933 | |
| Download: ML20031A310 (1) | |
Text
P
%iL A. - ~ [i,l i p s-
' L IN DONSE REPLY T0: M80lll4
- e.n nic,%
e 5
f UNITED STATES
!V NUCLEAR REGULATORY COMW!!3SION
,,,,g,
- ,g
- g W ASH IN GTON. D.C. 20555 0
.7%
4
/
~
Novenber 26, 1980 OFFICE OF THE SECRETARY MEMORANDUM FOR:
William J. Dircks, Exec Dir for Operations Leonard Bickwit, Jr., General Counsel Edward Hanrahan, Director, Polic'y Evaluation FR0!!:
Samuel J. Chilk, Secretary y
SUBJECT:
STAFFREQUIREMENTS-BRIEFINbBY)IEONCURRENTSTATUSOF INDIAN POItiT-2 INVESTIGATION'0F~THE CONTAIOMENT FLOODING EVENT AND BASIS FOR ALLOWING RESTART OF INDIAN P0litT-3; AND DISCUSSION OF INSTRUCTIONS TO BOARD ON INDIAN POINT PROCEEDING, 10:00 A.M., FRIDAY, NOVEMBER 14,1980, C0lPISSIONERS' CONFERENCE R00'1, D. C. OFFICE (OPEN TO PUBLIC ATTENDANCE)
(CONTINUED AT 2:00 P.fl.)
The Commission was briefed on the status of the IE investigation of the Indian Point-2 containment flooding.
The Commission discussed with staff the proposed Order on Indian Point, contained in SECY-A-80-179A/179B.
The Commission directed that the General Counsel revise the draft Order as discussed at the meeting, with the inclusion of a paragraph, to be drafted by OPE, that would serve as an alternative to paragraphs 17 and 18.
(It was recoonized that the language of that paragraph n ght affect the wording of other portions of the Order.
(0GC/0PE) (SECY Suspense: 11/24/80) cc:
Chairman Ahearne Commissioner Gilinsky Commissioner Hendrie Commissioner Bradford Commission Staff Offices PDR
- jh..
ll
(,
a L:
( -
~
k t,
f CHRISTI80-562 PDR C
O.
Tjy[Q(k. j !-
r-fM b'. -
INRESPONp.REPLYT0: M801114 UNITED STATES ih p
E NUCLEAR REGULATORY COMMISSION e
WAS41N GTON, D.C. 2G355 ig
'+,,
November 24, 1980 OFFICE OF THE SECRETARY MEMORANDUM FOR:
Leonard Bickwit, Jr., General Counsel Edward Hanrahan, Director [/ Policy Evaluation FROM:
Samuel J. Chilk, Secreta
SUBJECT:
EXCERPT OF STAFF REQUIR TEtT - BRIEFING BY IE ON CURRENT STATUS OF INDIAN POINT-2 IN ESTIGATION OF THE CONTAINMENT FLOODING EVENT AND BASIS FOR ALLOWING RESTART OF INDIAN POINT-3; AND DISCUSSION OF INSTRUCTIONS TO BOARD ON INDIAN POINT PROCEEDING, 10:00 A.M., FRIDAY, NOVEMBER 14, 1980, COMMISSIONERS' CONFERENCE ROOM, D. C. OFFICE (OPEN TO PUBLIC ATTENDANCE)
(CONTINUED AT 2:00 P.M.)
The Comnission discussed with staff the proposed Order on Indian Point, contained in SECY-A-80-179A/179B.
The Comnission directed that the General Counsel revise the draft Order as discussed at the meeting, with the inclusion of a paragraph, to be drafted by OPE, that would serve as an alternative to paragraphs 17 and 18.
(Itwas recognized that the language of that paragraph might affect the wording of other portions of the Order.
(0GC/0PE)
(SECY Suspense:
11/24/80) cc:
Chairman Ahearne Commissioner Gilinsky.
Commissioner Hendrie Commissioner Bradford Commission Staff Offices PDR Sk.0 )
V
'A. I (
f DC.h :,% b d e
2 j