ML20030E166

From kanterella
Jump to navigation Jump to search
Informs That Info Re Control of Heavy Loads Will Not Be Submitted by 810922.Most Info Will Be Submitted by 811223. Limited Areas Requiring Input from NSSS May Be Delayed Until 820203
ML20030E166
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/11/1981
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, TASK-A-36, TASK-OR NUDOCS 8109180074
Download: ML20030E166 (1)


Text

.......-

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET e

E A

P.O. BOX 8699 h

f%

1881 -1981 4

"HILADELPHI A. PA.19101

a..c 171931
  • I

'1' (215)041 5003 JC,, EPH W. G ALLAGH ER

.g-September 11, 1981 % *Amme m

_j

.ac,.,c... uc,...

4.

..~.

,o~

.......~,

\\,

g'9 Docket Nos. 50-277 d

50-278 Mr. Darrell G.

Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulations US Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

Your letter of December 22, 1980, concerning Control of Heavy Loads requested that our final report. be submitted by September 22, 1981.

Due to the large amount of material required, the extensive nature of the review, the necessary involvement of an Architect Engineer and Nuclear Steare System Supplier (NSSS), plus the potential effects on operations which must be addressed, we will be unable to provide our response by the requested date.

To date, upwards of 4500 manhours has been expended in the associated analysis and report preparation.

It is er.ticipated that this figure may exceed 6000 manhours before the report is complete.

These figures do not include involvement in corrective actions for identified potential problems.

As a consequence, we anticipate forwarding the bulk of our final report by December 23, 1981.

The limited areas requiring input from the NSSS may be delayed until February 3, 1982.

As stated in our letter of June 18, 1981, we shall continue to initiate corrective measures as soon as practical after the identifications of potential problems.

l If there are any further questions on this matter, please do not hesitate to contact us.