Requests Review & Approval of Integrated Leak Rate Tests Scheduled to Be Performed Per 10CFR50,App J
ML20030E029
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/09/1981
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8109170302
Download: ML20030E029 (1)


Text

BALTI M ORE GAS AND ELECTRIC CHARLES CENTER.R O. BOX 1475 BALTIMORE, MARYLAND 21203 Septenber 0, 1981 ARTHUR E. LupeovALL..JR.

VtC E PRE S< DE NT s..,..g Office of Nuclear Peactor Pegulation m

x U. S. ?!uelear Peculatory Co:-nission e

Jf)

Washington, D. C.

20555

-i

$).$

9

\\,

\\

Attn:

"r. Robert A. Clark, Chief h[ULL L

[\\

Oneratinc Peactors Branch #3 93 S l. f, g ggj p-n Division of Licensing UA %mpt

Subject:

Calvert Cliffs Puelear Power Plant g

Unit "o.

2, Docket "o. 50-318 h

Interrated Lenk Pate Test Schedule Cu2 N

Peferences:

(a) 10 CF' Part 50 Annendix J (b) EPAE Letter fron A. E. Lundvall, Jr. to D. G. Eisenhut dated 2/15/80, ILPT Pesults.

Centler.en:

The followinc Intecrated Lenk Pate Tests (ILPT's) are scheduled to be nerfor ed on Calvert Cliffs finit 2, nursuant to Reference (a):

Fall 1032 outage (ILPT #2)

Fall 1085 outare (ILPT #3)

Peference (b) contains the results from the first ILRT on Unit 2, which did not meet all of the ILPT criteria of Reference (a). Therefore, in accordance with paracraph III.A.6 of Peference (a), we request your review and appro' ' t of the above schedule for future Unit No. 2 ILPT's.

Very truly yours J

ic uw cc:

J. A. Biddison, Esquire G. F. Trowbridge, Esquire

?'essrs. D. Jaffe R. E. Archittel Q\\

9 6\\

8109170302 810909 PDR ADOCK 05000318 p

PDR k