ML20030D659

From kanterella
Jump to navigation Jump to search
Forwards Radiological Contingency Plan,Per NRC 810211 Order to Modify License
ML20030D659
Person / Time
Site: 07001113
Issue date: 08/27/1981
From: Vaughan C
GENERAL ELECTRIC CO.
To: Cunningham R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20030D660 List:
References
19582, NUDOCS 8109140320
Download: ML20030D659 (1)


Text

O$Al fb 3 Ctnm2/2-lY G E N E R A L h) E LE CTR IC D SS.

b NuC PRODUCTS DIVISION WILMINGTON MANUFACTURING DEPARTMENT CASTLE HAYNE RO AD. P. O. BOX 780. W1LMINGTON, N. C. 28402. (919) 343-5000 August 27, 1981 Director Office of Nuclear Materials Safety & Safeguards 2

U. S. Nuclear Regulatory Commission a-^

Washington, D. C.

20555 Attention:

Mr. R. E. Cunningham, Director Division of Fuel Cycle & Material Safety y

iTS,' f

Dear Sir:

CC C

References:

(1) NRC License SNM-1097, Docket #70-1313

/

~if (2) NRC Order to Modify License, 2/11/81

{. ! *

}

Subject:

RADIOLOGICAL CONTINGENCY PLAN SEP 111981 ~

With reference to activities authorized by NRC license SNM-1 7

N'S at the General Electric Company fuel fabrication facility in x \\'

Wilmington, N.

C.,

GE hereby submits the Radiological Conting Plan as required by the referenced Order to Modify License, os f

In accordance with 10 CFR 170.31, this submittal is considered license fee exempt since this is in response to a wTitten order by the NRC.

General Electric personnel would be pleased to discuss this g

with you and your staff as you deem necessary.

g g{g8VE0 Very truly yours, g

g 00C88 GENERAL ELECTRIC COMPANY S~m ussac sq j gg SEP 8198P y hh$

M

{flll ronI SilSectio, N""

Charles M. Vaughan, Acting Mana \\,Q>

4,/

y c$nx Licensing & Compliance Audits

[

M/C J26 W'

cy CMV:bmw

  • Enclosures (7) u,.

,.. g fyggK NSD-L

[

? L Ca g;af j

'NO YII/[{ t'gf r, 0109140320 810827

{DRADOCK 07001113 PDR