ML20030D371
| ML20030D371 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/30/1981 |
| From: | Linder F DAIRYLAND POWER COOPERATIVE |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| TASK-08-01.A, TASK-11-01, TASK-11-1, TASK-8-1.A, TASK-RR LAC-7695, NUDOCS 8109010311 | |
| Download: ML20030D371 (1) | |
Text
__.
D DA/RYLAND h
k COOPERAT/VE
- Po BOX 817
- 2615 EAST AV SOUTH = LA CROSSE W1SCONSIN 54601 (608) 788 4 000 July 30, 1981 In reply, please l
refer to LAC-7695 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch #5 g
4 Division of Operating Reactors g
U. S. Nuclear Regulatory Commission p
Washington, D. C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE 2
gg 0158; gg, LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 M ggmas Q SEP STATUS - GENERIC TOPICS 8
N 7;cp \\li
Reference:
(1)
NRC Letter, Crutchfield to Linder, if dated June 12, 1981.
4*
Gentlemen:
Your letter (Reference 1) requested the establishment of new submittal dates for generic SEP topic responses identified as having status 2 or 5.
Topic VIII.l.A - Degraded Grid Voltage The submittal of this response has been delayed due to the need to complete review of environmental qualifications of plant equipment.
It will be submitted by September 15, 1981.
Topic XI-l - Appendix I The submittal of revised Appendix I Technical Specifications is scheduled for November 30, 1981.
If there are any questions regarding this letter, please let us know.
Very truly yours, DAIRYLAND POWER} COOPERATIVE
[
q rL4-w/L-z, s
Frank Linder, General Manager FL:JDP:af cc:
J.
G.Keppler, Reg. Dir., NRC-DRO III f P[
NRC Resident Inspectors 8109010311 810730 68 0 PDR ADOCK 05000409 l
P pop
. -- _