Responds to Violations Noted in IE Insp Rept 50-341/81-09. Corrective Actions:Site Contractor & Project QA Procedures Revised to Include Written Procedures for Storage & Preservation of QA Records
ML20030D202
Person / Time
Site: Fermi 
Issue date: 08/15/1981
From: Wells D
DETROIT EDISON CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
EF2-54-140, NUDOCS 8108310512
Download: ML20030D202 (5)


Text

e Doriald A. Wells Detroit N ^ ~"

Ecison Rhin!==

August 15, 1981 EF2-54,140 Mr. Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Ca mission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Fiorelli:

Subject:

Noncompliance t Enrico Fermi Unit 2 Construction Site This letter responds to the items of noncompliance contained in your IE Report 50-341/81-09. This inspection of Enrico Fermi Unit 2 Site Construction activities was perfonmd by Messrs. B. H. Little and P. M. Byron of NRC Region III on June 1-30, 1981.

Only the cited item of noncompliance is discussed in this reply, as required by Section 2.201 of the NRC's " Rules of Practice", Part 2,

'Iitle 10, Code of Federal Regulations.

The enclosed response is arranged in sequence of items cited in the body of your report. The finding and section numbers are referenced.

We trust this letter satisfactorily answers the concerns raised in your report. We shall be glad to discuss any further concerns you may ha're.

Very truly yours, g

HAW:mb p

AUC 0 xea A

2 I

s 4

s, u e

rce

\\9Bi 0108310512 810915' N

gDRADOCK 05000341 PDR

}

Mr. G. Fiore111, Chief August 15, 1981 Page '1ko EF2-54140 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Ccmnission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Cmmission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166

=

'IHE DEIROIT EDISON 0]MPANY OUALITY ASSURANCE DEPARIMENT ENRICO FIRMI 2 PROJECT Response to NRC

. port No. 50-341/81-09 Docket No. 50-341 License No. CPPR-87 Inspection at: Fermi 2 Site, Monroe, Michigan Inspection conducted: June 1-30, 1981 Prepared by:

, {f.

If.A. Walker, Supervisor Construction Quality Assurance Approved by:

.de

[w T.A. Alessi, Direcgor Project Quality Assurance t

i I

\\

l 1

Page 2 of 3 Response to NRC Inspection Report #50-341/81-09 Statement of Violation 81-09, Appendix A (81-09-01)

Contrary to the requirements of 10CFR50, Appendix B, Criterion V; the Enrico Fermi 2 FSAR, Section A.17.1.2; and the EF2 OA Manual, Section 18.2.1, the licensee and a subcontractor do not have written procedures which delineate methods for the storage and preservation of OA records.

Corrective Action Taken and the Results achieved Site contractors as well as Project Quality Assurance have procedures that control quality assurance records. These procedures did not contain the items noted by the inspector as defined in item 4 on page 3 of the inspection report.

Contractor and Project Quality Assurance procedures have been changed to cddress these concerns and have been issued for use or are currently in the approval cycle. The Enrico Fermi 2 Quality Assurance Manual has been revised to include storage requiremerts for quality assurance records. This revision is currently in the approval cycle prior to issue. A surveillance has been conducted on the quality assurance :.ecord storage areas of site contractors performing safety related work. These contractors maintain OA records in Detroit Edison furnished one hour fire rated cabinetn with access limited to specified personnel. Fire extinguishers are available in the innediate vicinity of record storage areas.

No water lines run through any of these areas. Additional measures are now be-ing implemented for record preservation including the posting of "No Smoking" signs and the addition of snoke alarms where deemed necessary.

Corrective Actions Taken to Avoid Further Noncompliance Project Quality Assurance and all safety-related site contractors are in the process of reviewing and revising their QA Manuals and/or procedures to ade-quately describe OA record storage and protection requirements. Construction Quality Assurance will continue to include these requirements as audit check list items to verify implementation.

Date When Full Canpliance Will be Achieved _

Site contractor and Project Quality Assurance procedures have been revised and I

have been issued ar are in the approval cycle. Issue of all revised quality I

assurance record procedures will be canpleted by September 30, 1981. The Fermi l

2 Quality Assurance Manual revision will be issued for use by October 31, 1981.

i Quality record storage areas have been reviewed by Project Quality Assurance and i

the NRC inspector's concerns have either been addressed or are in the process of j

being addressed. This will be canplete by August 31, 1981.

l l

l

~.

J

=

Page 3 of 3 l

The foregoing statements are based on facts

.l and circumstances which are true and accurate i

to the best of my knowledge and belief.

J

.6 1/ A ff.A. Walker, Supervisor Construction Quality Assurance v