Contact: Coordinate 9th Annual Water Reactor Safety Research Meeting, Awarded to SA Szawlewicz
ML20030C960
Person / Time
Issue date: 08/17/1981
From: Perlman J, Szawlewicz S
NRC OFFICE OF ADMINISTRATION (ADM), SZAWLEWICZ, S.A.
To:
Shared Package
ML20030C959 List:
References
CON-FIN-B-8086, CON-NRC-04-81-218, CON-NRC-4-81-218 NUDOCS 8108280460
Download: ML20030C960 (4)


Text

sTANARD EOCis ADM'N:srufiON aM 26. JutY 19e6 RAGE l Or ciNieu stiv AWARD / CONTRACT 1

e e

'4 itD PeOC. #EG.141Cf t) 9 l3.101

1. CON? TACT ( Pr.<. liss.1/tif.) No.

2 EFf tCTIVE Daft

3. REQVl$fflON/PURCMA$t RIQUIST/P80 JECT NO.
4. CERTIFitD FOf NitsON4 DEFEN5I UNDtB SDSA NRC-04-81-218 8-1 7-81 RFPA RES-81-218

'5NG S ISSUID BY CODE

e. ADaiNisitt!D BY CODE l
7. Druvief

"/*"""'

7755" US Nuclear Regulatory Commission Division of Contracts, ACB, SPS Washington, DC 20555 f,'i,7#"

e. CONTRACTOR CODE l l

FACllJTY CODE l

9. D'5 COUNT poa PaOMPT PAVMENT NAME AND ADDRf 55 l

~

(sma. <Nr.

Stanley A. Szawlewicz anexar. suse.

,a nP,es,;

4913 Butternut Drive Rockville, MD 20853 io. suwT iNvoicts.Iss ssO-N iN e'tOCr"12' (d aren e ' " '

,,,,f,siTO ADD

11. SHl.8 LD/ MARK f 0R CODE l l

12 PAYMENT WILL BE MADE gy CODE l US Nuclear Regulatory Commission US Nuclear Regulatory Commission ATTN:

D. Ross, 1130-SS Office cf the Controller Washington, DC 20555 Washington, DC 20555 10 U.S C. 2304 (eX l

13. THIS PROCustMINT WAS Advt RTISED, NIGCilATED, PUR$UANT TO:

h dl U.S.C. 252 (cx 3 Id. ACCOUNTING AND APPROPRIATION DA1A B&R:

60 19 11 02 FIN:

88086 - 58,000.00 15.

16.

17.

33.

H.

20.

iT E M NO.

SUPPttt S / 5t ev$CES Q U A NTIT Y UNIT UNIT PtiCE AMOUNT Coordinate,9th Annual Water Reactor Safety Research Mesting -

Firm-Fixed-Price......... $0,000.00

.e

~

t a

b 21.

TOTAL AMOUNT OF CONTRACT s 58,000.00 CONTRACTING OFFICER li'lLL COAfPLETE BLOCK 22 OR 26 AS APPi1CABil

22. } CONTRACTOa's NEGOTIAftD AGattu!NT (Ceerracoor is rrgeired se sige 2 s.

AWARD (Centractor is neo regeured se sign obis dueseres.;

i e ener 3

,eri,,,. e.,ei., eec,.;

C.ae..co.,

.a s

.c N -be,

..aci.d. sh.

,ue s.co,.,,es,,,or.

e2 f.es.sh end det... eli demo e, pe #. eli ehe see..ces see tenh er sahee-eee edda..a., cheapes sn.d by y h.ch eddn.eas er cheages e o see fenh in fed!

.denf. d ebe.e.ad en ear seaeJave a shees fee the c.ae.de ehen eteeed he'em.

ob 6e he.by eccessed es to the neme t..d ebe ead en ear coatmushea sk es.

The e. ghee. d obl.pam a. of ne remn se eh.s senereo sheti be e bieo se ead se*

Thee e ord ceae.mmeees the ceanect wh.ch seas.oo of the felle-ias derw*e'*e> lel eened ty the s. lie..ag d.c 4... toi eh.e.. dre aereo, (b) ehe o.l.ca.hea, if ear.

me oe..,a..ae's e.t.caehoa end y.or efter, and (b) m.. e-eed/ceaereo. No

.e1 (c).ch pee....eae. ee peese.neheae, cen.fices.eas. ead spes. A<eheas, es ere f nho, c.,,ecevet d.c..ae se.seeee,y.

eaeched.* i se.p... red by eete.eace kere a.

( Attachments are finard barrie.)

22. NAM Of CONTRACTOe 27.' UNITED STA S AMIRICA

.I f ? TON SY M', _- Y. w.e.a -,..so.ee...a, 8,,..aer e Ceae ce_, o,_.,

sy g

2.8. NAME APO Tffti Of SIGNE R (Type er press)

23. DATE 58GNED
29. NAME OF (JIINiitrCTING OfflCit (Typt er perst)
29. Daft $4GNED S f a s t-N /\\. s 2. A s t4wi c T-

%.T N '

J0YCE PERLMAN E/

8 o egogg7 W,w 7

" ' " ~ ' ' ' " ' ' " ' ' " " ' ' " " * ""'

NRC-04-81-238 PDR

mevrmwat->

Page 2 of 4 1

ARTICLE I - BACKGROUND The US Nuclear Regulatory Commission is committed to continuing the sponsorship of the Water Reactor Safety Research Information Meetings which are an important function in furthering the NRC's roles and objec.tives in fostering the safety of nuclear power plant operation.

The Information Meetings provide an international forum for determining the overall status and progress in nuclear safety research in the US and in other parts of the world.

This is accomplished by the participation in the meeting and special workshops of technical representatives of more than twenty foreign countries.

ARTICLE II - SCOPE OF WORK The Contractor shall coordinate and administer the planning and arrangements for conducting the 9th Water Reactor Safety Research Information Meeting to be held at the National Bureau of Standards, Gaithersburg, Maryland, on October 26-30, 1981.

The Contractor shall make arrangements for meeting facilities, motel reservations, bus transportation, luncheons, the preparation anf distribution of meeting notices and the agenda, and the publication and distribution of papers presented at the meeting.

Government facilites and funds are to be employed for these activities with the exception of the costs of the luncheons, coffee, and beverages served at the meeting.

These items are paid for through a registration fee that is char;;ed to meeting attendees.

The Contractor shall supervise the activities for conducting the meeting at the time of the meeting, including the collection of the registration fees, the coordination of payment of debts of the meeting, and the administrative wrap-up of the meeting.

The Contractor shall prepare a report delineating the procedures followed in coordinating the meeting.

The report shall include all the necessary steps taken to accomplish the scope of work, including a list of invitees, points of contact, attendees, etc.

The report shall contain a summary of the conference events and a recommendation section to detail any changes deemed necessary for the future. The report shall be submitted to the Project Officer within thirty (30) days after the conference.

ARTICLE III - PERIOD OF PERFORMANCE The period of performance with respect to this contract shal.1 commence on the date of award and all work shall have been completed by November 30, 1981.

ARTICLE IV - CONSIDERATION The Contractor shall be paid the firm-fixed-fee of $8,000.00 in full consideration of performance hereunder.

ARTICLE V - OBLIGATIONS The amount presently obligated by the US NRC with respect to this contract is

$8,000 00.

NRC-04-81-218 Page 3 of 4

' ARTICLE VI - PAYMENT Payment shall be made in_accordance with Clause 2 of the General Provisions entitled " Payments" as soon as practicable after completion and acceptance of all work, upon submission by the Contractor of voucher (s) in a fom satisfactor to the Contracting Officer, provided, however, that said payment (s) shall not be deemed to prejudice any rights which the Government may have by law or under other provisions of this contract.

_ ARTICLE VII - PROJECT OFFICER D. Ross is hereby oesignated as the Contracting Officer's authorized representativ (hereinafter called Project Officer) for technical aspects of this contract.

Project Officer is not authorized to approve or request any action which results The claim or dispute arising under the contract; or issue any whatever.

The Project Officer is responsible for:

(1) monitoring the Contractor's technical progress, including surveillance and assessment of performance, and recommending to the Contracting Officer any changes in requirements; (2) faterpreting the scope of work; (3) performing technical evaluation, as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting the Contractor in the resolution of technical problems encountered during performance.

Within the purview of this authority, the Project Officer is authorized to review all costs requested for reimbursement by contractors and submit recormendations f approval, disapproval, or suspension for supplies / services required under this contract.

any changes in terms, conditions, or amounts cited -in-the contra For guidance from the Project Officer to the Contractor to be valid, it must:

(1) be consistent with the description of work set forth in the contract; (2) not constitute new assignment of work or change to the expressed terms, conditions, or specifications incorporated into this contract;

r NRC-04-81-218 Page 4 of 4 not 'onstitute a basis for an extension to the period of performance or (3) ccatract delivery schedule; and, as stated above, (4) not constitute a basis for any increase in the contract cost.

ARTICLE VIII - DISSEMINATION OF CONTRACT INFORMATION The Contractor shall not publish, permit to be published, or distribute for public consumption any information, oral or written, concerning the results or conclusions made pursuant to the performance of this contract without the -

(Two copies of any material prior written consent of the Contracting Officer.

proposed to be published or distributed shall be submf tted to the Contracting Officer.)

ARTICLE IX - GENERAL PROVISIONS This contract is subject to the Fixed Price Research and Development Contracts Under $10,000 General Provisions dat 1 November 14, 1977, which incorporates the FPR Chcnges and Additions and the NRC Additions, which is attached hereto and made a part hereof.

Clause 14 entitled " Patent Rights - Acquisition by the Government" is deleted in its entirety.