ML20030C760
| ML20030C760 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 08/18/1981 |
| From: | Hood D Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 10818, ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8108280093 | |
| Download: ML20030C760 (7) | |
Text
_
DISTRlBUT10N:
Docket Nos. 50-329/330 LB #4 r/f JKane g\\
DEisenhut JRinaldi
$G EAdensam RLandsman DHood Glear Docket Hos: 50-329 OM, OL MDuncan LHeller and 50-330 OM, GL SHanauer ACappucci RTedecco WPaton APPLICANT: Consumers Pawer Company RVollmer JKnight TMurley JKeppler FACILITY:
Midland Plant, Units 1 & 2 RMattson RHartfield, MPA bcc: TERA
SUBJECT:
TELECOM SUM!MRY OF JULY 23, 1981 OELD NRC/PDR OIE (3) local PDR TIC NSIC On July 23, 1981 Messrs. G. Kelley, T. Sullivan and D. Budzik of Consumers Power Cogany (CPC) called D. Hood to ask or state several points. Replies were made by return call this sane day.
(1) The information regarding surcharging of the BWST valve pits and associated crack monitoring requested July 15, 1981 by D. Boyd and J. Kane is being forwarded by cover letter dated July 21, 1981.
Express copies to NRR and IE-RIII will be delivered today and are being mailed to the U.S. Arny Corps of Engineers, Detroit District.
This matter is impacting construction and expedited review is requested by CPC.
A.
If the Corps receives its copy by July 27, 1981, Mr. J. Kane and others will provide staff comments on July 23 letter by telecon on Ju?y 30, 1981.
(2) The borings and sampling for the revised location of the eight interceptor dewatering wells for the Service Water Structure have Deen completed. What information does the staff need for its reviev?
A.
CPC should provide a letter stating the results and its cor.clusions as to whether the material encountered is adequately protected by the filter pack on the basis of the visual and lab test classification results. Summary of the lab results should be enclosed with the letter.
(3) CPC stated that the same technical specification, QC instructions and CPC overinspection plan used for the twelve interceptor wells previously approved by t.RC will also be used for the balance of the plant area dewatering wells. Other than documentation of this statement, what information does NRC need for approaval of well installations of these remaining area dewatering wells?
A.
Mr. Kane questioned the applicant's need for an additional partial approval (well installation) as compared to over-all resolution of the permanent dewatering system design.
CPC will reply in a forthcoming letter.
In order to I
~
omcq l
suanauQ 8108280093 810818 PDR ADOCK 05000329 PDR can!, A
.c
- * " -32"24 nac rosu m no em sucu e24o OFFICIAL RECORD COPY
ak a u -a S o=L -
A A J s*4-Am a
&+m..-+.ma-m _w kama_s._-
A.
"ma--
ends m
'm-am m mm m as =
u-w- -* w. -
s.-
s 'snm n am-
-em-sa m+na-as I
I e
t e
1 l
I I
t i
I
~+
l l
l l
f I
a S'
4
?
]
9 i
I t
1 m
b i
M l
h b
-hs t
l 4
{
i
{
I h
E e
I
~--- ^^ --
MEETING SEMARY DISTRIBUTION Docket File 40 ' S f '/ O '% O '
G. Lear NRC/PDR S. Paulicki Local PDR V. Benaroya TIC /HSIC/ TERA Z. Rosztoczy LB #4 r/f W. Ilaass H. Denton D. Muller E. Case R. Ballard AUG 1 0 98j D. Eisenhut W. Regan R. Purple R. Mattson B. J. Youngblood P. Check A. Schwencer
- 0. Parr F. Miraglia F. Rosa J. Miller W. Butler G. Lainas W. Kreger R. Vollmer R. Houston J. P. Knight T. Murphy R. Bosnak L. Rubenstein F. Schauer T. Speis R. E. Jackson W. Johnston Attorney, OELD S. Hanauer i
OELD W. Gamill 0IE(3)
T. Murley ACRS (16)
F. Schroeder
'Qk R. Tedesco D. Skovholt d,
I K. Kniel
/f' N [ O'\\'I N. Hughes M. Ernst G. Knighton 50 NRC
Participants:
fg b
of g A. Thadani (ff & //
W. Butler D. Tondi 9 " [' j C
J. Shapaker J. Kramer 1-N C. Tinkler D. Vassallo
'E J. Long P. Collins
//' ' N'( 3 '
K. Parczewski D. Ziemann l
D. Hoatson A. Toalston S. Lewis V. Moore E. Ketchen M. Srinivasan Chief, SPEB: DST bec: Applicant & Service List R. Gamble E. Adensam Project Manager D unna Licensing Assistant M. Duncan J. Keppler J. Kane F. Rinaldi R. Landsman G. Lear L. Heller A. Cappacci t
W. Paton J. Knight
4
=- _.._-, s
-.-m 4-
.m auw s.
-m.
.ea-+-
-+. -..,
an u a m m u.--c A w e, _Ja--.ua A
w.A 1.
4 a,+.
A..mLa 3-m.
f J
3 e
f a
(
i 1
i l
J i
i i
i e
9 J
a W
h a
i b
j
. I t
t.
1 E
h I
e 4
4 e
4 4
I r
F 4
k 4
4 l
4 -
.w-J 6
f Y
f i
)
4 e
1 i.
1 4
b i
4 1
1 N
k i
2
+
+
1 A
(
i l
3 I
i h
5 4
e f
A d
s 4J U
T 4
L is'
?
T i
4 4
4
!i e
t-w vw +-g s==W w r$=r w twes-14& w.
-m we w -weem wwr ee c e
..m+eceme.,,
+- es.a
- wee r -wsw.ww e*e-
,~ w wv ert._
se,-s ee
- a m
o.
guG 18 D01
_2 i
I respond, Mr. Kane indicated that past staff comments on the pencnent dewatering systen review should be checked, particularly 50.54(f) Request 47 and from the draft Corps letter of April 16, 1981 provided CPC during the oral deposition of J. Kane. The NRC would also need reasonable assurance that the gradations of foundation materials within the depth interval where the remaining well screens are to be placed are adequately protected by the filter pack. A more conplete NRC reply will be provided about August 21, 1981.
(S) When will the draft 4/16/81 letter request of the Corps (which is being revised based upon the meeting of May 5-7, 1981) be issued?
A.
At the noment, Mr. Kane's higher project priorities include hearing supnert, seismic spectra reviews, BWST surcharge, dewatering installation, and dike and DGB boring / sampling resul ts.
Issuance of the revised letter requests are not expected until after mid-September.
(5) CPC's report on crack analysis requested by the Naval Surface Weapons Center and due July 20, 1981 will be delayed until August 10, 1981.
(6) The staff requested that a visit by its Caseload Forecast Panel to assess overall completion schedules be scheduled about August 25-27, 1981. Discussions should be held at a location readily acces:ible to the public.
(7) Discussions also included the general status of the overall OL review.
/5/
Darl Hood, Project Manager Licensing Branch No. 4 Division of Licensing cc: See next page
- NOTE: SEE PREVIOUS WHITE FOR CONCURRENCE
" ' " >.D.L;LB,f 4,,,
- LB,,(,4,
""""> *0Hond/hac...;
.a o...
. EMensan..
- Mane.......
""> 7R9RLY. IA1/A.......
. 7./.2 9./81,...
,,2/,29/81,,,,
.8/
NRC FORM 3 8 8
RCM C240 OFFICIR RECORD COPY
.uwo im_m5
--.-4
~-:..._...
__n..
.---..-an I
i l
4 i
l l
.d 4
1 4
ki 1
I r
I t
i i
f i.
4 J
s 1
l I
1 4
F k
t i
r e
c I
i e
t
+.
.'k s
5 i
r f
J l
a D
I 1
4 e
J a
i
.ew--...
4
-
- v-w w,-e,,rv..
r-
.n.-*.mw~--.~w,:..
MIDLAND Mr. J. W. Cook.
Vice President Caumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc:
Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zacarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1
1 First National Plaza William J. Scanlon, Esq.
- Chicago, Illinois 60603 2034 Pauline Boulevard Janes E. Brunner, Esq.
Ann Arbor, Michigan 48103 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Myron M. Cherry, Esq.
Midland, Michigan 48640 1 IBM Plaza Chicago, Illinois 60511 Ms. Barbara Stamiris 5795 N'. River Ms. Mary Sinclair Freeland, Michigan 48623 5711 Summerset Drive Midland, Michigan 48640 Stewart H. Freeman Assistant Attorney General State of Michican Environmental Prctection Division.
720 Law Building Lansing, Michigan 48913 l
Mr. Wendell Marshall Route 10 Midland, Michigan 48640 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108 l
+
,AA4.,A aJ__sE"'"^^'
-".hA&whW+ #JEWa h-p. NM _.5.4.Jm _. m J A_m R W E - -
--'W--
MMst NhihMN-M6 C.MANm,d
&&M&E, s.MM.W.,.
i 1
- I
[
P e
i I
i
\\
k l
l t
?
l f
k e
h i
I i
r.
- 1:
b t
b I
r e
l t
f t
k i
f i
i a
t i
w
Mr. J. W. Cook,
cc:
ComT.ander, Naval Surface Weapons Center ATTN:
P. C. Huang White Oak Silver Spring, Maryland 20910 Mr. L. J. Auge, Manager Facility Design Engineering Energy Technology Engineering Center P.O. Box 1449 Canoga ' ark, California 91304 Mr. William Lawhead U.S. Corps of Engineers NCEED - T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226-Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Ralph S. Decker
~
Atomic Sa'fety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. Frederick P. Cowan Apt. B-125 6125 N. Verde Trail Boca Raton, Florida 33433
.i e
/
tu'u u
7..__.
..__..___-._..m. _. _ _. _ _ _..... _
-___m...-
i 0
0 i _.
i L
L I
I I
l-i
- [
i i
L l-f f
i r
t k
i f
t 4
4 i-t-
S r
f 4
5 l.
I k-I s
l'.
i a
DISTRIBUTION:
Docket Nos. 50-329/330 LB #4 r/f J. Rinaldi DEisenhut RLandsman EAdensam Glear DHood LHeller Docket Hos: 50-329 OH, OL MDuncan ACappucci and 50-330 OH, CL SHanauer WPaton RTedesco JKnight RVo11mer APPLICANT: Consumers Power Company TMurley bcc: TERA RMattson NRC/PDR FACI ITY:
Hidland Plant, Units 1 & 2 RHartfield, MPA Local PDR OELD NSIC
SUBJECT:
TELECON
SUMMARY
OF 4" Y 23,1981 OIE (3)
TIC JKeppler On July 23, 1981 Messrs. G. Kelley, T. Sullivan anb". Budzik of Consumers Power Conpany (CPC) called D. Hood to ask or state several points. Replies were made by return call this same day.
(1) The information regarding surcharging of the BWST valve pits and associated crack monitoring requested July 15, 1981 by D. Boyd and J. Kane is being forwarded by coverletter dated July 21, 1981.
Express copies to HRR i.nd IE-RIII will be delivered today and are being mailed to tne U.S. Army Corps of Engineers, Detroit District.
This matter is impacting construction and expedited review is requested by CPC.
N
\\
A.
If the Corps receives its copy \\ y July 27, 1981, Hr. J. Kane b
and other will provide staff connents on July 23 letter by telecopy on July 30, 1981.
1 (2) The borings and sampling for the revised location of the eight interceptor dewatering wells for the Service Water Structure have been completed. What information does the staff need for its review?
\\
\\
A.
CPC should prcvide a letter stating the results and its y
conclusions a: to whether the material encountered is adequately prCected by the filter pack on the basis of the visual and lab test classification res' lts. Summary u
of the lab results should be enclosed with the letter.
(3) CPC stated that the same technical specificatior:, QC instrctions and CPC overinspection plan used for the twelve interceptor wells previously approved by NRC will also be used for the balance of the plant area dewatering wells. Other than documentation of this statement, what information does NRC need for approaval of well installations of these remaining area dewatering wells?
A.
Hr. Kane questioned the applicants need for an additional partial approval (well installation) cs compared to over-all resolution of the permanent dewatering system design.
CPC will renly in a forthcomina letter.
In order to OFFICE )
-
- N...k.
. hb.!.. d.4
.hb.!bO.
SURNAMEh.h.h.
. h.....
..b.
. [)......
M.....
...............a....
DATE )
....-..a.a.aa.
~ ~.a.a.aa.a.aa.
a..~.-a.a....=a
==.a....~..a.aa l
l nac ronu ais oo-ao) Nacu cao OFFICIAL RECORD COPY us= mi-mea j
yL3 4.Je 4 4 4-ee m-elR eaWAsJ-LE---m M-hE--4 4
44MRd-*L W-+k 4
LA44M-2F_b aJ.i.4 J
e-=4 4<CEth n JL a
---.4.
- -d.
Wh Amm4h5 me2 A
Je__--
ce
- -+ MAMA &esMA M.4.m&ahM.M.a, i
6 o
J F
i i
s
=
5 t
t, m
a f
I l
A b
[
f If s
'-I f
f 3
o Ii f
r
(
,t e
t i
I 1
h i
I j
i j
(
I.
t i.
1 t
I 4
h 4
4 2
4 t
-.t i
i
)
e
. respond, Mr. Kane indicated that past staff coments on the permanent dewatering system review should be checked, particularly 50.54(f) Request 47 and from the draft Corps letter of April 16, 1981 provided CPC during the oral depasition of J. Kane. The NRC would also need reasonable assurance that the gradations of foundation materials within the depth interval where the remaining well screens are to be placed are adequately protected by the filter pack. A more complete NRC reply will be provided about August 21, 1981.
(4) When will the draft 4/16/81' letter request of the Corps (which is being revised based upon the meeting of May 5-7,1581) be issued?
A.
At the moment, Mr. Kane's higher project priorities include hearing support, reismic spectra reviews, BUST surcharge, dewatering installation, and dike and OGb boring / sampling results. Issuance of the revised letter requests are not expected until after mid-September.
(5) CPC's report on crack analysis request'ed by the Naval Surface Weapons Center and due July 20, 1981 will be delayed until August 10, 1981.
(6) The staff requested that a visit by its Caseload Forecast Panel to assess overall completion schedules be scheduled about August 25-27, 1981. Discussions should be held at a location readily assessible to the public.
(7) Discussions also included the general status of the overall OL review.
s Darl Hood, Project Manager Licensing Branch No. 4 s
Division of Licensing
\\
h l' OFFICE).... *......
k
.0.HQQd/.hb,
..F.t9.uncAa....... EMo n u[.
.... : )[Mf..... ". " " " * " ".. ".......
...."."...y suRuwe >
1!.Gl.81........]l....!E.1..........ll.UIE1.....
......l.b.
5.L
- ~. " ~ ~ ~ ~ ~..
~. ~. - " ~ ~ ~ ~
" " ~ ~. ~ ~. " " ~
omy iac FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY usca misei- =5 m j