ML20030C509
| ML20030C509 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 08/21/1981 |
| From: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| PSI-NRC-0006, PSI-NRC-6, NUDOCS 8108260182 | |
| Download: ML20030C509 (8) | |
Text
.
s'*
0821814000
'g s- ' m..
os c;
lif.uLi,L a 51981
- PUBLIC i t.
pg SERVICE D"
C#'
INDIANA p
August 21, 1981
/ h.i)T,
/b PSI /NRC - 0006 S. W. Shiclds Senior Vice President -
Nuclear Division Mr. Harold R. Denton, Director Docket Nos.:
STN 50-546 Of fice of Nuclear Reactor Regulation STN 50-547 U.S. Nuclear Regulatory Commission Construction Permit Nos.: CPPR-170 Washington, D.C.
20555 CPPR-171 MARBLE HILL NUCLEAR GENERATING STATION UNITS 1 AND 2
Dear Mr. Denton:
In response to the Public Service Company of Indiana, Inc. (PSI) commitment to notify your office of organizational changes which alter the PSI organization as described in the Consolidated Description of the Marble Hill Quality Assurance Program, a summary of the latest (July, 1931) PSI Nuclear Division organizational changes has been attached for your information.
Included in this summary are title changes which will help you better understand the organizational charts.
It you have any questions, please contact me at your convenience.
Sincerely,
,/
l S. W. Shields LGY/dks Attachment i
I cc: V. Stello, Jr.
J. G. Keppler l
E. R. Schweibinz, P.E.
l J. J. Harrison l
810826018*7 810821' DR ADOCK 05000546 PDR
\\
P. O. Box 190, New Washington, Indiana 47162 812. 289.1000 hl l
I J
ATTACHMENT I 1.
The title of Project Director has been changed to Executive Director Nuclear Project Management. Now reporting to this position are the Project Contract Managers, previously reporting to the Assistant Project Director, the Project Purchasing Manager, and the Assistant Project Director as shown on Figure 1-2.
2.
The Assistant Project Director now has the Project Administration Manager, the Safety and Fire Prevention Supervisor, the Project Engineering Manager, and the Project Controls Manager reporting to him as shown in Figure 1-2A.
These positions previously reported to the Project Director.
3.
The title of Operations Director has been changed to Executive Director Nuclear Operations. The resps asibilities of the Nuclear Operations Manager have been incorporated into this position. Also, the Testing organization headed by the Test Director, previously reporting to the Project Director, now reports to the Executive Director Nuclear Operations as shown on Figure 1-3.
4.
The title of Quality Assurance Manager has been changed to Executive Director Nuclear Quality Assurance.
5.
The position of Construction Surveillance Superintendent has been deleted and its responsibilities incorporated into the respective discipline Quality Engineering Superintendent positions. The discipline Construction Surveillance Supervisors, previously reporting to the Construction Surveillance Superintendent, now report to the respective Quality Engineering Superintendent as shown on Figure 1-4.
6.
The position of Quality Systems Superintendent has been deleted. The Audits Supervisor and the Operations Supervisor, both previously reporting to th ^<?tity Systems Superintendent, now report directly to the Executive alrector Nuclear Quality Assurance. The position of Program Support Supervisor, previously reporting to the Quality Systems Superintendent, has been deleted but its function and responsibilities incorporated into the Quality Administration Superintendent position.
7.
The title of Quality Assurance Records Supervisor has been changed to Quality Records Verification Supervisor as shown on Figure 1-4.
8.
The position cf Quality Assurance Administration Supervisor has been deleted but the function remains the responsibility of the Quality Administration Superintendent.
l a
._m Page 2 ATTACHMENT I (Cont'd)
- 9. The position of Tracking and Trending Supervisor has been deleted. The responsibility of trending remains in the scope of the Quality Engineering Manager while the responsibility of tracking is now the responsibility of the individual organizations involved in the disposition process.
- 10. The position of Civil Inspection and Testing Services Supervisor has been added. He reports to the Civil Quality Engineering Superintendent and is responsible for direct supervisory control of the Civil Inspection and Testing Services Program.
j i
f i
e i
1 1
., -. - ~ - -.
e n
6O m
Z O
E<ZP O<
w N_
.J Ch O3Z c
D-<
0>
20 0 yb CC a
w<w o
g O
-DZ O O<
W wgC C
E<3 D
rw a 9
3d<
0W w
w-XZ w
a W<
zW8 002 9zb 33<
EOw QE5 3$C DW Z Owa LW-n.
C h
2 HO op W
een Cc 90C aw 2gC wO N4 5
m o 20 aw Us
>s wa z
XD WZ OC 2W
<0 Cmh
<Z$9<2 o*5e a
C Z 0a Ow w u.
C<
COH H0 OwH wmZ cow
-C2 O o. w wg0
><4 pw2 yJ<
en og2
.-g W Z 1
W
~
.! mE ea EN o-s a Q. d
EXECUTIVE DIRECTOR NUCL AR PROJECT MANAGEMENT ASSISTANT PROJECT Din ECTOR SEE FIGURE 1 -2A PROJECT
~
PROJECT PROJECT PROJECT PROJECT
^
^
^
Ft PC ING MANAGER MANAGER MANAGER MANAGER MANAGER R
MATERIALS civil MECHANICAL ELECTRICAL COMPOSITE MARBLE HILL PROJECT MANAGEMENT ORGANIZATION PUBLIC SERVICE INDIANA T
FIGURE 1-2 AS OF 741 Public Service Indiana LF 61424 8/81
ASSISTANT PROJECT D1 RECTOR PROJECT SAFETY AND PROJECT PROJECT ADMINISTRATION FIRE PREVENTION ENGINEERING CONTROLS MANAGER SUPERVISOR MANAGER MANAGER l
i MARBLE HILL PROJECT MANAGEMENT ORGANIZATION PUBLIC SERVICE l
INDIANA j
Public Service Indiana FIGURE 1-2A AS OF 741 LF 61422 8/81 l
14 7
F O
S N
A L
SO L
I R NI HA O TA E E ITZ L L AI B C N
R R U A
E ANPG M
ORO 3
1 E
RU G
R R
I F
ASE E LG LE A CUN UFA N
M EA CCN I
I LVA BR ID UE N
PSI R
O TC S
ER R N R
I A O O
TT DE I
SC T
E L A F E V C T R R
I U E TNP ID U
O C
~
E X
E R
N E OI G TA AN TA SM an ia dn 1
i 8 e/
c8 iv 1
re2 S4 ic1 l
6 buF PL
,l l
0 EMECUTivE DaHECTOM NUCLE AM OUALITY ASSURANCE l
OUAL IT Y E NGtNE E HING M AN AGE R f
_W4 L DING /NDE_
~~l 1.
I i
E L E C1 HIC AL ME CHANICA L C4V8L OU At lT Y OuAt lT V OV A L IT Y OU ALITY QUALITY ENGINE E HENG c NGINE E HING E NGINE E HING ENGINE E RING INSPLCTibe; ADMINISTHATION gl HINil NDt NT E{mTE NDE N T SUPE RIN TE NDE r*T
_jtF{!!!N T{ N,91.N_L SUPE HINTE NDE N T SUPEHINTENuENT E L E ClHnCAL MECH NIC A L CIVIL /STRUCTUHAL HECE8FT STOHAGE 44E5^ T
& M AINTEN ANCE PHOC'o.JP T
GUALITY HE COHDS CONS THUC140N CONSTHUCTION CONS T HUCT F'*.
INWE CTION S uMCE SUHVE 5L LANCE SUHVEILLANCE SuHVE 8L L Ah %
SURVEIL LANCE SLFtVE 4LL ANCE VE Hit lCATION Sirt HVISOH StwEHVISOH StFt HVISOM SUPLHVISOR SUPE RVISOR SUPE H VISOR SUPL HVISOR SUPEHylSOH SUPLHVISOH civil INSPECTION ANO TE STING
~
SE HV6CLS SUPEHVISOM MARBLE HILL NUCLEAR QUALITY ASSURANCE ORGANRATION PUBLIC SERVICE INDIANA Public Service Indiana FIGURE 14 AS OF 741 LF 61-620 8/81
/
_