OPERATING DATA REPORT DOCKET NC.
50-293 DATE 08/12/81 COMPLETED BY C C Whitney TELEPHONE M 7 7u 7900 OPERATING STATUS Pil -im I Notes
- 1. Unit Name:
July, 1981
- 2. Reporting Period:
1998.
- 3. Lic ad Thermal Power (MWt):
678.
- 4. Nameplats Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
655.
6, Maximum Dependable Capacity (Gross MWe):
690.
- 7. Maximum Dependable Capacity (Net MWe):
670.
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None None S. Power Level To Which Restricted. If Any (Net MWe):
l l
- 10. Reasons For Restrictions,if Any:
N/A l
This Mcnth Yr..to.Date Cumulative 744.0 5087.0 75767.0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 509.1 4561.5 54746.I 0.0 0.0 0.0
- 13. Reacr< r Resene Shutdown Hours
- 14. Hours Generator On.Line 474.7 4498.1 53005.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated (MWH) 907680.0 8297352.0 90586728.0 I
- 17. Gross Electrical Energy Generated (MWH) 310000.0 2828350.0 30157714.0
(
- 18. Net Electrical Energy Generated (MWH) 298090.0 2720734.0 26971341.0 l
- 19. Unit Service Factor 63.8 88.4 70.0 l
- 20. Unit Availability Factor 63.8 88.4 70.0 l
- 21. Unit Capacity Factor (Using MDC Net) so a 79.8 57.1
- 22. Unit Capacity Factor (Using D.'R Net) 61.2 81.7 58.4 36.2 6.7 10.1 i
- 23. 'Jnit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each1:
l l
Refuel Outage commencing September, 1981.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Unit Opr rating
- 26. Umts in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8108260138 810812 PDR ADOCK 05000293 gaf773 R
PDR' L
4 DOCK -T. NO.
50-293 UNIT Pilgrim I DATE 08/12/81 COMPLETED BY G.G. Whitney TEllPHONE 617-746-7900 MONTH JULY. 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 0.
657.
1 g7
~
658.
2 0.
gg 657.
0.
39 l
3 0.
660.
~
l 4
20 663.
I O.
33 g
0.
662.
6 3;
660.
0.
23 4
657.
3 192.
24 9
593.
25 658.
239.
TO 26 0.
658.
gg 7
g;
.0.
3 657.
660.
298.
,9 g3 621.
619.
9 30 638.
31 0.
16 657.
LNSTRUCTIONS On this format.!ist the average dany unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whale meg 2 watt, i
(0/77)
6 I)OCKET NO.
50-293 IINIT SillflDOWNS AND POWER REDUC 110NS UNIT NAME PIT,GRTM T DATE OR/17/R1 REPORT MONIll.IULY, 1981 COMPl.ETED BY G.G.Whltney TEl.EPilONE:
617-746-7900 I
=
a
.$ E 3
$Y5 1.icensee En,
'1, Cause & Correceive No.
Date g
3g jg5 Event g,7
^ ' " " ' "
$E 5
3 is c Report #
mO Eo Present Recurrence H
o B
u e
6 i
l 11 81/06/30 F
179.3 A
3 N.A.
EA TRMSP Reactor Scram due to Main Transformer Lightning Arrestor failure.
12 81/07/10 F
65.6 A
2 81-037/03L CI PUMPXX "A" Recire. Pump Seal Failure 13 81/07/30 F
24.4 A
2 81-039/03L CI VALVEX Packing leak on "A" Recire. Discharge Valve.
4 l
i 2
3 4
F: Fmced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Pseparation of Data P Maintenance 6 Test 2-Manual Scram.
En' y Sheets fm 1.icensee C Refueling 3 Automatic Scram.
Event ReporI (1.t:3) File INilRI G-D Regulatmy Restriction 4 Other (Explain) 0161)
E-Operator Training & IJcen::e I!xamination F-Administrative 5
G.Operailonal Error (Explain)
Exhiba 1 Same Soun e 19/77)
Il-Other (Explain)
lllI L
u D
A A
A A
A A
E w
/
/
/
/
/
/
T N
N N
N N
N u
A I
C y
O n
S e
o S
a A
F 1n iW N
EC NN
~
OE I R e
A A
A A
A V
/
/
/
/'
/
/
IT N
N N
N N
OT E
N C
O N
d r
I A
e a
T N
r e
e A
E E
i e
ec u
l e
T T
C aw R
ve n
hc l
S N
N pe s
l n r
t u a
I A
en dl an o
iN e
R A
N R
na Vo T
w S
E M
E h
ae C
r d
d a d
"1 W
T d t S
e e
ee e
O D
N ei t
F E
I cw ld e
th cY c
T A
a i e dT sc a
s a
R A
M l cc uc e
n ut ldt l
A L
pss b a dd o ji pol p
E E
eii el d ni d w eoe e
L R
RDD R p Aat AS RGB F
C U
Y d
T j
e e
t E
M F
E
. v t
i a
l A
S l
lF e
R S
U a
a s
h G
A mr mrr r
L R
C ra raa A
A A
e I
O oe oe e
/
/
/
v P
J f
O NW NWY N
N i
AM e
a N
p O
d a
I e
C T
k C
a t
k N
e s
a U
L e
e F
Ty L
L s
t s
A l
ki t
l M
A a
al A
l a
/
e ei
/
e e
N S
Lb N
B S
0 "A
T p
p p
N m
m "B m
E u
N P e u"
g u
O g
P n
P P
Wr d
i 6
h M
S a cn p
1 e
O Sh ra i
r C
c i
P 1
T i
s 0
G c
"E i c "A e
2 3
B e
" D R"
N 1
S R
M 9
2 0
3 8
2 E
2 5
1 T
S Y
I
[l
[
- lI
- )l llll l(
!l lJi m
S
~
REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
.For your convy.nience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuc~ ear Power Station, Docket l
Number 50-293.
l 2.
Scheduled date for next Refueling Shutdown:
September, 1981 3.
Scheduled date for restart following refueling:
f 4.
5.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
l I
l 6.
The fuel, which had been loaded during the 1980 scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DR3282 assemblies and 120 PSDR3265 assemblies.
l 7.
(a)
There are 580 fuel assemblies in the core.
(b)
There are 764 fuel assemblies da the spent fuel pool.
8.
(a)
The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
l (b)
The planned spent fuel storage capacity is 2320 fuel assemblies.
9.
With presen; spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1006 fuel assemblies.
l l
o
- ^.-
1 BOSTOW EDISON COMPANY PILGRIM NUCLEAR POWER STATION l
Summary of Operations for JULY 1981
)
On July 1, the unit was off line for "A" Recirculation Pump Seal replacement and Main Transformer repairs. On July 6 at 0155 hours0.00179 days <br />0.0431 hours <br />2.562831e-4 weeks <br />5.89775e-5 months <br /> the reactor was taken critical and unit heat-up commenced. At approximately 0900 hrs. July 6, the station was informed of engineering concerns with the assuraace of continued availability of the SBGTS under accident conditions.
The unit was taken suberitical and placed in the cold shutdown condition until concerns with the SBGTS were re, solved.
On July 8 the reactor was taken critical at 0319 hours0.00369 days <br />0.0886 hours <br />5.274471e-4 weeks <br />1.213795e-4 months <br /> and the unit was syn-chronized to the system at 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> an July 8.
The unit rer.ched 100% at al,-
proximately 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on July 10 and at 1306 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.96933e-4 months <br /> the reactor was manually scrammed because of excessive drywell unidentified leakage. Leakage was identi-fied as failure of "A" Recirculation Pump seal which was replaced.
The reactor was taken critical at 1507 hours0.0174 days <br />0.419 hours <br />0.00249 weeks <br />5.734135e-4 months <br /> on July 12 and synchronized to the system at 0644 hours0.00745 days <br />0.179 hours <br />0.00106 weeks <br />2.45042e-4 months <br /> on July 13.
The unit reached 100% at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> on July 15 and continued at this level until July 30.
On July 30 the unit was shutdown at 2338 hours0.0271 days <br />0.649 hours <br />0.00387 weeks <br />8.89609e-4 months <br /> because of unidentified leakage which was identified as packing on the "A" Recirculation Pump discharge valve.
The uu tt remained shutdown for the remainder of the month.
Safety / Relief Valve Challenger for July, 1981:
Report Requirement: TMI T.a.P. II.K.3.3 No Challcages for this month.
O I
.