581 gg y Georgia Power Company Post Offee Box 4545 Atlanta, Georgia 303o2 f;Vog l oject Telephone 404 522-606o Southem Corrpany Services, Inc.
Post Office Box 2625 I
Bumngham, Alabarna 35202
/[
[
g Telephone 205 870-60t1 0
3 i3, April 1, 1981 5
?
United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File:
X78G03-M9 Atlanta, GA 30303 Log:
GN-125 Attention: Mr. James P. O'Reilly
Reference:
Vogtle Electric Generating Plant - Units 1 & 2 50-424; 50-425; Interim Reports dated 7/23/80 and 11/11/80 Gentlemen:
Georgia Power Company has previously reported a potential deficiency to the NRC concerning centrifugal charging pump operation following secon-dary side high energy line ruptures.
In our previous interim report of November 11, 1980, Georgia Power Company advised that it was expected that a final report concerning correc-tive action would be submitted by April 1, 1981.
Westinghouse has advised that a proposed solution is being reviewed. After appropriate approval, a generic solution will be distributed to electric utilities having Westinghouse reactors. Georgia Power Company expects to submit a report i
concerning the corrective action that will be taken to resolve this issue on or before December 18, 1981.
Additionally, Westinghouse has advised the NRC of a problem concerning the pump shafts of the centrifugal charging pumps. The pumps currently at Plant Vogtle have the "old" balance drum locknut design. Arrangements will be made to have the locknuts exchanged for ones of the latest design.
This response contains no proprietary infonnation and may be placed in the NRC Public Document Room upon receipt.
Ve ulyIyou I
,1
-fCA C208250258 8104og Doug Dut an 5
DR ADOCK 05000424 Project General Manager f [0 s
PDR CWH:tp xc:
(See Page 2) j
$6"M
s
- ~
Mr. James P. O'Reilly
- 50-424/50-425; Interim Reports - 7/23/80,11/11/80 April 1, 1981 t
Page 2 xc:
U. S. Nuclear Regulatory Commission Attn: Victor J..Stello, Jr., Director Office of Inspection and Enforcement Washington, DC 20555 J. H. Miller, Jr.
W. E. Ehrensperger F. G. Mitchell, Jr.
R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton R. W. Staffa H. C. Nix K. M. Gillespie L. T. Gucwa C. R. Miles, Jr.
E. D. Groover D. L. McCrary R. A. Thomas
- 0. Batum J. A. Bailey M. Z. Jeric B. L. Lex l
Y