Responds to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. Facility Will Be in Conformance W/Bwr Owners Group Criteria After Current Refueling Outage.Enhancing Mods Will Be Delayed
ML20030B927
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/20/1981
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
IEB-80-17, NUDOCS 8108250195
Download: ML20030B927 (2)


Text

.

PHILADELPHIA ELECTRIC COMPANY srme,j 2301 MARKET STREET

}

\\

g P.O. BOX 8699 1881 1981 PHILADELPHI A, PA.19101

@ lA 4

/

. m o u o.u,,o,,

misi e*5*i s

t ggkprq Q

.uM "=..

August 20, 1981 pt

/,UG 2 41981 > "'gI t.

Cp MMY" k I

bceket Nos. 50-277 Ih 50-278

>,6

/

IE Bulletin 80-17

,-g Mr. Darrell G. Eisenhut, Director Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

This letter is concerning modifications presently being made on Peach Bottom Unit 3 scram system piping in response to IE Bulletin 80-17 My letters to you, dated December 16, 1980 ard August 29, 1980, committed to completing those modifications necessary to conform to the design and perfomance criteria developed by the B'a3 Owners Group. In addition, certain modifications were identified which were to be undertaken to enhance the performance of the system. Specifically; a) Provide cross connection piping between the discharge volume vent lines on each unit, upstrea= of the vent valves, such that a vent path to both headers will be assured, given the failure of a vent valve to re-open on scram reset.

b) Provide a vent path between the top of the instrument volume and the discharge volume vent system to assure that any air trapped in the system during a scram is at the high point of the system. The impact of air expansion on the level instrumentation on scram reset is thereby u nimized.

At the conclusion of the current refueling outage, Unit 3 will be in confomance with the B'aR Owners Group criteria. Due to time constraints, difficulties with design, and material acq'lisition we will not be able to complete the enhancing modifications on Unit 3 during the present refueling outage. However, these modifications will be completed during the next outage of sufficient duration requiring a full block of all of the control rod drives, 001 0108250195 810820 j,g PDR ADOCK 05000277 g

PDR

Page 2 The enhancing modifications are not a requirement of the IE Bulletin, its supplements, or related Confirmatory Orders but were offered in order to provide an extra margin of protection l

and reliability.

If you have any questions, do not hesitate to contact us.

Very truly yours,

)

)

L afb cc: US Nuclear Regulatory Commission Office of Inspection & Enforcement Division of Reactor Operations Inspection Wachington, DC 20555 1

1 l

M