Responds to NRC 810803 Request for Schedule in Responding to Chemical Engineering Branch & Geotechnical Engineering Questions.Response Will Be Provided in FSAR Amend in Sept 1981
ML20030B693
Person / Time
Site: Clinton  
Issue date: 08/14/1981
From: Wuller G
ILLINOIS POWER CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
References
U-0277, U-277, NUDOCS 8108180511
Download: ML20030B693 (1)


Text

/LLINDIS POWER 00MPANY U-0277 ff7 LO3-81(08-14)-6 500 SOUTri 27TH STREEr, DECATUR, ILLINOIS 62525 August 14, 1981 Q1] N N

I-'g b

[,

Mr. Rcbert L. Tedesco

-2.

Assistant Director for Licensing

')),,1. 7 60,#[j

~.

'~

Division of Licensing Office of Nuclear Reactor Regulation

8;.

n4 U.S. Nuclear Regulatorf Commission p

Washington, D.C.

20555 be y

Dear Mr. Tedesco:

tD

Reference:

Tetter 8/3/81, R. L. Tedesco, NRC to G. Wuller, IP, Subj ect :

Request for Additional Information -

Clinton Power Station Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 This is in reply to the referenced letter wherein you requested our schedule for r<.9,3onding to the Chemical Engineering Branch and Geotechnical Engineering questions.

Illinois Power plans to respond to the questions provided in the enclosure to the referenced letter via an FSAR amendment in September, 1981.

Sincerely, J

G. E. Wuller, Supervisor Licensing Nuclear Station Engineering GEW/em cc:

Mr. J. H. Williams, NRC Clinton Project Manager Mr. H. H. Livermore, NRC Resident Inspector

\\

0 0D6x 8108180511 810814

\\)

PDR ADOCK 05000461

\\

4 PDR