ML20030B510
| ML20030B510 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/07/1981 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-PT21-81 10CFR-050.55E, 10CFR-50.55E, BN-141, NUDOCS 8108180225 | |
| Download: ML20030B510 (2) | |
Text
-.
Georgia Power Company Post Office Bom 4545 L
Atlanta, Georgia 30302 404. ?2-6060 Telephone
\\\\Q kk Southern Company Services, Inc.
Post office Bon 2625 Birm.agham Alabama 35202 Telephone 205 870 6011 (D[I 'h c
p.
/h T\\V:fif.uJ D s
-['-
k August 7, 1981 (6. f,0G 17198 E $
~
m.a g C z
United States Nuclear Reg 11atory Commission Office of Inspection and L'nforcement 4
Y 4
Region II, Suite 3100 101 Marietta Street Fila: X7BG03-M18 Atlanta, Georgia 30303 Log:
GN-141 Ref.: Vogtle Electric Generating Plant - Units 1 and 2 50-424, 50-425; Containment Liner Penetrations - Unit 1 Attention: Mr. James P. O'Reilly Gentlemen:
Georgia Power Company has conciuded its evaluation concerning the investigation regarding the reportability of the above-referenced item.
It has been concluded that the welding defects associated with the containment liner penetrations would not adversely affect the safety of operations and are not reportable under 10CFP,50.55(e) or Part 10CFR21.
This response contains no proprietary information and may be placed in the NRC public document room upon receipt.
Yo s ly, n
Do9gDuton u
Project Genera' Manager CWH: sew sh 8108190225 810807 PDR ADOCK 05000424 S
Mr. James P. O'Reilly 50-424, 50-425; Containment Liner Penetrations - Unit 1 August 7, 1981 page two xc: U. S. Nuclear Regulatory Commissior.
Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, D.C.
20555 J. H. Miller, Jr.
R. J. Kelly R. E. Conway G. F. Head R. H. Pinson C. F. Whitmer D. L. McCrary R. A. Thomas J. A. Bailey
- 0. Batum D. E. Dutton K. M. Gillcapie E. D. Groover L. T. Gucwa B. L. Lex C. R. Miles, Jr.
H. C. Nix R. W. Staffa J. L. Vota l