e TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 374ol 400 Chestnut Street Tower II August 11, 1981 HTRD-50-518/81-08, -510, -520, -521/81-07 PBRD-50-553/81-10 g
XI IA.f}f S
k Mr. James P. O'Reilly, Director Office of Insoection and Enforcement p<
f;[jg IIO3Ih
% "*** W,p '$~
U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street 4
/)g
, }
b Atlanta, Georgia 30303 sear Mr. O'Reiily:
HART.3VILLE AND PHIPPS BEND NUCLEAR PLANTS - REPORTABLE DEFICIENCY -
cr FAILURE BY ITT GRINNELL TO USE PROPER TESTING METHODS - HTRD 50-516/81-08, -519, -520. -521/81 PBRD-50-553/81-10 c.n The subject deficiency was initially reported to NRC-0IE, Region II, Inspector Pete Taylor on !! arch 4,1981 as NCR-7.
The first and second interim reports were submitted on April 3 and May 19, 1981, respectively.
In compliance with paragraph 50 55(e) of 10 CFR Part 50, we are enclosing the third interim report on the subject deficiency.
TVA anticipates transmitting the final report on or before December 16, 1981. The 10 CFR Part 21 implications of this deficiency will be determined by further testing and evaluation. If you have any questions, please call Jim Domer at FTS 857-2014.
I Very truly yours, TENNESSEE VALLEY AUTHORITY L. M.' M111s, yanager Nuclear Regulation and Safety Enclosure cc:
Mr. Victor Stello, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Vashington, DC 20555 s,h 8108180171 810813 PDR ADOCK 05000518 S
PDR An Equal Opportunity Emphyer
I
~-
,s e
~.
ENCLOSURE FAILURE BY ITT GRINNELL TO USE PROPER TESTING METHODS 10 CFR50.55( e)
HTRD-50-51d/81-08, -519, -520, -521/81-07 PBRD-50-553/81-10 REPORT NO. 3 (SUPPLEMENTAL INTERIM)
Description of Deficiency This deficiency involved fittings such as piping tees and elbows on 23 spoolpieces.
The pipe sizes invcived are 12, 20, and ?4 inches. During a review of material test reports for fittings on the spoolpieces, it was noted by ITT Grinnell that certal" items which should have been examined by penetrant or magnetic testing were actually examined by ultrasonic testing (two circumferential directions). This testing is not in accordance witi) ASME P&PV Code, 1074 Edition, Winter 1975 Addenda, Subarticle NB2551(b), which requires penetrant or magnetic particle testing of fittings for Nucicar Class 1.
Interim Progress TVA has reviewed the subject nonconformance report along with ITT Grinnell's proposed disposition, and as a result, has determined the following corrective action, are required to accept the fittings:
(1) Fittings welded to spools must pass magnetic particle examination of all external surfaces and all accessible internal surfaces in accordance with NB-2551(b) (ASME, Winter 1975 Addenda).
(2) Because the fitt,ings were fabricated frcm a number of different heats, a sampling of inaccessible inside surfaces of a selected number of fittings shall be examined to assure the quality of all the heats involved. The selected fittings shall be removr.d from the spool pie.as by sectioning.
A minimum number of two from each heat shall be examined.
-