Suppls 810312 Response to IE Bulletin 81-01, Surveillance of Mechanical Snubbers. Four Snubbers Which Failed Have Been Replaced
ML20030B249
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/17/1981
From: Eckert R
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-81-01, IEB-81-1, NUDOCS 8108060254
Download: ML20030B249 (4)


Text

6 Richard M. Eckert Public Service Electric and Gas Cc,mpany 80 Park Plaza Newark, N J. 07101 201/430-8096 Senior Vice Pressjent Ereigy Suppiy and Engineering July 17, 1981 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement

', ' /

U.S. Nuclear Regulatory Commission Region I 6

fb

S N

631 Park Avenue King of Prussia, PA 19406 L/1.)

Dear Mr. Grier.

0 5 581 am r

{

NasD E 5

SUPPLEMENTAL RESPONSE TO NRC IE BULLETIN 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS h

N

^3 I

UNITS NO. 1 AND 2 SALEM GENERATING STATION DOCKET NOS. 50-272 AND 50-311 In accordance with Bulletin 81-01 all mechanical snubbers have been inspected and tested.

The description of the inspection and test methods used was described in our initia, response dated March 12, 1981.

The results of the inspection of the remain ng snubbers are as follows:

Unit 1:

87 snubbers tested - 2 failed Unit 2:

87 snubbers tested - 2 failed 1

Type and Size Ouantity Remarks PSA-1/4 29 4 failed PSA-1/2 7

PSA-1 42 PSA-3 70 PSA-10 21 PSA-35 5

Total 174 l(

si 9 8108060254 010717 PDR ADOCK 050002{

s

Mr. Boyce H. Grier, Director U.S.

Nuclear Regulatory Commission 7/17/81 Serial Type and Size Number Location Cause of Failure PSA-1/4 842 6'-6" West of Failed Manual Stroke Col JJ @ El. 109' Test PSA-1/4 6001 Annulus Area 9" Failed Manual Stroke West of B16-2 Test

@ El. 90' PSA-1/4 836 Penetration Area Failed Manual Stroke

@ El. 100' Test PSA-1/4 837 Penetration Area Failed 5 inual Stroke

@ El. 100' Test The failed snubbers, located on the Steam Generator Blowdown System, were found in a locked up position during functional testing.

An Engineering study was performed on each failed snubber to determine the effect on the Steam Generator Blowdown System.

The results indicated that failure of Snubber Serial No. 842 had no effect on operability of the design loading.

Snubber Serial No. 6001 is required for seismic protection of the system, therefore, it may be assumed that since the snubber could not perform its intended function, the piping may have been affected had a seismic event occurred.

However, since only one snubber in the seismically affected area was found inoperable, contributing only an insignifi-cant factor towards seismic protection, the system integrity was not impaired.

The Engineering evaluation of snubbers Serial Nos.

836 and 837 indicated that the system integrity is not impaired, considering the effects of the locked snubbers.

The cause for failure of Snubber Serial No. 6001 has not been determined.

The snubber is being returned to the vendor for evaluation and determination of the mode of failure.

The failure of Snubbers Serial Nos. 842, 836 and 837 appears to have been caused by personnel accidentally stepping on them during the construction stages.

All four snubbers have been replaced in kind.

Design change 2EC-0650 has been initiated to replace Snubber Serial No. 6001 with a larger capacity unit to preclude the failure of the snubber in this location.

4 i

i Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission 7/17/81 1

The reevalusilon of Snubbers berial Nos. 836 and 837 indicated that they are not required for seismic protection of the system.

Design change lEC-1260 will be issued to remove these snubbers.

4 This completes our requirements in accordance with IE Bulletin 81-01.

If you have any further questions, we will be pleased to discuss them with you.

1 l

Sincerely, j

9

)(t&

7 1

CC Director l

U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement i

i Washington, D.C.

20555 1

I l

l l

I I

l

\\

l l

l l

j E

=

t

~

o STATE OF NEW JERSEY

)

)

SS:

COUNTY OF ESSEX l

COUNTY OF ESSEX

)

RICHARD M. ECKERT, being duly sworn according to law deposes and says:

I am a Senior Vice President of Public Service Electric and Gas i

Company and as such, I signed the letter dated July 17, 1981, to Mr. Boyce H.

Grier, Director, NRC Office of Inspection and Enforce-ment, Region I, as a supplemental response to NRC IE Bulletin No. 81-01 titled " Surveillance of Mechanical Snubbers".

The matters set forth in said response letter are true to the best of my knowledge, information and belief.

(

&t

~

RICHARD M. ECKERT Subscribed and sworn to before me this d day of hju,

1981 I

/

/

h 6 4%

Notar Public 04/New Jer ey My Commission expires on d4. -

. _