Forwards NRC & Applicant Order of Witness Presentation Per ASLB 810616 Order.Certificate of Svc Encl.Related Correspondence
ML20030B130
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 08/03/1981
From: Culp R
HOUSTON LIGHTING & POWER CO., LOWENSTEIN, NEWMAN, REIS, AXELRAD & TOLL
To: Cheatum E, Linenberger G, Wolf S
Atomic Safety and Licensing Board Panel
References
NUDOCS 8108060112
Download: ML20030B130 (6)


Text

.

EELATED. CORRESPONDENCE LAW OFFICES LOWENSTEIN, NEWM AN, REIS & AXELH AD 4025 CON N ECTICUT AVENUE, N. W.

montat Lowensrciu WAS HINGTON, D. C. 20 036 scena Newwas tenROLD F. REIS

' ' m. I i,, p'),

ucualCE AR ELR AD 202*862-8400

-)

natwLatm M.sutA p

s J. a. n ou a n io nt. sa.

\\

e meewartA.eAusta g,

onvio a. poacL6 g

I.

N

'\\

DouOL As '3. GR E E N fg k

~

\\-

c.o.cC,.A.~rs August 3, 1981 c.~ c corv.~o A-9 g g 0 5198> u g

.o....

. cut.

C",*,'r."A~,,

u.uou.

%ftsrag recorm c s. onAv

'g g/

aLvis w. outran =Aw OnvtO S. R A$niN DON ALD J. sikvCRM AN 4

6 g

Sheldon J. Wolfe, Esq., Chairman Atomic Safety and Licensing ef' t

Board Panel U.S. Nuclear Regulatory Commission

/f, ty Washington, DC 20555 AUG 41981 > 3 Mr. Gustave A. Linenberger Office d t!. ssmW7 6

Atomic Safety and Licensing OcWDZ & SmI2 U2d Board Panel g

g U.S. Nuclear Regulatory Commission 4

Washington, DC 20555 Dr.

E.

Leonard Cheatum Route 3, Box 350A Watkinsville, Georgia 30677 In the Matter of Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1)

Docket No. 50-466 1

Gentlemen:

Pursuant to the Board's Order of June 16, 1981, the Applicant and NRC Staff have conferred with respect to the i

order of presentation of witnesses for the August 17-28 evidentiary hearings.

As a result of these dircussions, the Applicant and Staff submit to the Board and the parties the attached Order of Witness Presentation.

A schedule for the presentation of witnesses for the September hearings will be filed on August 31, 1981, in accordance with the Board's June 16 Order.

As the Board will appreciate, we have had some difficulty in scheduling witnesses during the two week August session due to long planned vacations and other commitmente.

In choch4 PDR.

I k i

~

I.ownNsTeix, New> TAM, Reis & AXE 1.HAD Sheldon J. Wolfe, Esq.

Mr. Gustave Linenberger Dr.

E. Leonard Cheatum Page ivo August 3, 1981 particular, we have scheduled Staff witness Hodges to testify on a number of issues on August 20-21 since Mr. Hodges was I

not available during the week of August 24-28.

While the l

Applicant has normally presented its case on a particular issue before the Staff, we request that, in order to accommodate Mr. Hodges' schedule, the Staff be allowed to present its case on these issues prior to the presentation j

of the Applicant's witnesses.

If the Board has any problems with the proposed schedule, we would appreciate being so advised in order that any adjustments can be made as soon as possible.

Sireerely, N abd 2 MA 1

Robert H. Culp Attorney for Houston Lighting l

& Power Co.

RHC/fgr cc:

See attached Certificate of Service 1

1 1

4 1

L n,

-a.-

e -v

,,r--n.n--,...,-.-,,..,,-e,,.,,,,----w-,,,.

,---.m.

.-,-w..----,--e

---m---r--.--

n r, v..- -,-,o w-~,,

,r-r,.

w n-,,,

n -e n r m w wm -, - -,

Order of Witness Presentation Aug. 17 AM:

Doherty 7 (LPCI cold slug)

Brooks Doherty 6 (Recirculation pump overspeed)

Dillman PM:

Doherty 30 (Interconnection / Grid Stability)

J. Meyer; Chopra Aug. 18 AM:

Doherty 10 (Diesel generation)

Clarke, Montalbano; Chopra PM:

Doherty 8; Board Question 3 (ATWS)

Robertson Aug. 19 AM:

TexPirg 2 & 4 (Cooling lake)

Marrack PM:

Doherty 8; Board Question 3 (ATWS)

Hodges Doherty 17 (SRV reliability)

Hodges Doherty 32 (ECCS vaporization rate)

Hodges TexPirg AC 41 (Reactor pressure limit /SRV's)

Hodges TexPirg AC 53 (Noncondensible gases)

Hodges TexPirg AC 55 (Rapid depressurization/

steam break)

Hodges Board Question 6 (RHR single failure)

Hodges Board Question 17 (Non-safety grade equipment)

Hodges Aug. 20 AM - PM:

Hodges continued Aug. 21 AM:

Doherty 41 & TexPirg AC 54 (Reactor water level indicators)

Lane PM:

Open Aug. 24 AM:

Doherty 26 (Stud bolts)

Call PM:

Doherty 32 (ECCS vaporization rate)

Sozzi TexPirg AC 55 (Rapid depressurization/

steam break)

Hammon Aug. 25

  • AM:

TexPirg AC 53 (Noncondensible gases)

Elliott TexPirg AC 52 (Outside containment sampling)

Robertson TexPirg AC 28 (Post-accident monitoring)

Ranzau Board Question 4A and 4B (Combustible gas control and containment design basis)

Cheng, Weingart, Robertson PM:

Panel continued Board Question 10 (Drywell testing)

Cheng 3/

These witnesses will be presented as a panel.

t

1.

Aug. 26

  • AM:

Doherty 17 (SRV reliability)

Hucik/Boseman TexPirg AC 41 (Reactor pressure limit /

SRV's)

Huang Doherty 42 (Position indication for SRV's)

Bailey PM:

Panel continued Aug. 27 AM:

TexPirg AC 31 (Technical Qualifica-tions)

Oprea, Coldberg PM:

TexPirg AC 31 (Technical Qualifica-tions)

Allenspach, Gilray Aug. 28 AM:

Board Question 4A (Combustible gas control)

Fields

    • PM:

Open 1

J 0/

These witnesses will be presented as a panel.

o*/

Applicant and Staff have scheduled for the September hearings EEe remaining issues on which testimony was filed July 20 and 27.

These issues include Staff testimony on outside containment sampling, post-accident monitoring, reactor water level indicators and stud bolts; Applicant and Staff testimony on blockage of the intake canal, Part 100 releases, chlorine monitoring, TNT detonation and LPG pipe-line; and Applicant testimony on soil mechanics.

If issues are tried more quickly in the August session than are scheduled, the Applicant and Staff intend to move some of these issues into the August session.

UNITED STATES OF AMERfCA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

HOUSTON LIGHTING & POWER COMPANY

)

Docket No. 50-466,

)

(Allens Creek Nuclear Generating

)

Station, Unit 1)

)

)

CERTIFICATE OF SERVICE I hereby certify that ccpics of Applicant's letter to the Board dated August 3, 1981, were served on the following persons by deposit in the United States mail, postage prepaid or by hand delivery, this 3rd day of August, 1981:

Chase R. Stephens Richard Black, Esq.

Docketing and Service Section U.S. Nuclear Regulatory Office of the Secretary of Commission the Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555 John F. Doherty 4327 Alconbury Street Atomic Safety and Licensing Houston, Texas 77021 Appeal Board U.S. Nuclear Regulatory Commission Washington, DC 20555 TexPirg Att:

Clarence Johnson I

Susan Plettman, Esq.

Executive Director David Preister, Esq.

Box 237 U.S.

l Texas Attorney General's Office University of Houston P. O. Box 12548 Houston, Texas 7704 Capitol Station Austin, Texas 78711 Carro Hinderstein 609 Fannin Street Suite 521 Honorable Frank Petter Houston, Texas 77002 Mayor, City of Wallis P. O. Box 312 D.

Marrack Wallis, Texas 77485 420 Mulberry Lane Bellaire, Texas 77401 Hon. Leroy H. Grebe County Judge, Austin County Brenda McCorkle P. O. Box 99 6140 Darnell Bellville, Texas 77418 Houston, Texas 77074 Atomic Safety and Licensing V. O.

" Butch" Carden, Jr.

Board Panel City Attorney U.S. Nuclear Regulatory Commission City of Wallis Washington, DC 20555 P. O. Box A East Bernard, Texas 77435 y.

o James M. Scott, Jr.

13935 Ivy Mount Sugar Land, Texas 77478 William Schuessler 5010 Darnell Houston, Texas 77074 Stephen A. Doggett, Esq.

P. O. Box 592 Rosenberg, Texas 77471 Bryan L. Baker 1923 Hawthorne Houston, Texas 77098 J. Morgan Bishop Margaret Bishop 11418 Oak Spring Houston, Texas 77043 W. Matthew Perrenod 4070 Merrick Houston, Texas 77024 Wayne Rentfro P. O. Box 1335 Rosenberg, Texas 77471

>LLk \\k 1

1-4

.