Stipulation That Environ Coalition on Nuclear Power Withdraw Proposed Contentions 2 & 5
ML20030A949
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/22/1981
From: Johnsrud J, Lewis S, Trowbridge G
Environmental Coalition on Nuclear Power, METROPOLITAN EDISON CO., NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Shared Package
ML20030A947 List:
References
ISSUANCES-OLA, NUDOCS 8107300046
Download: ML20030A949 (2)


Text

-

,/ v,

- %'s, _

4 n\\

~

UNITED STATES OF A!iERICA 3

NUCLEAR REGULATORY COMMISSION g JUL 20198f > c L

4 ee Se:retar

, m.o swe,y a 0

CitaCh In the Matter of

)

)

4 METROPOLITAN EDISON COMPANY,

)

Docket No. 50-320 OL A

)

(Three Mile Island tiuclear Station, Unit 2)

STIPULATION REGARDING SETTLEMENT OF ISSUES For ea purpose of resolving Contentions 2 and 5 asserted in intervenor Environmental Coalition on Nuclear Power's ("ECNP")

" Supplement to Request fcr Hearing," dated June 23, 1980, but not yet adnitted as contentions in this proceeding, the licensee (Metropolitan Edison Company), ECNP, and the NRC Staff hereby stipulate as follows:

1.

In consideration of the infonnation supplied to it by the Licensee and Staff at the rfeetings held on July '.1 and August 18, 1980, as documented by the diagram attached to the letter of October 14, 1980 to Dr. Johnsrud fron Ms. Ridgway (copy attached), ECNP withdraws its

^

proposed Contention 2.

~

2.

In consideration of the modifications of Proposed Technical Specifications 6.10.1 and 6.10.2"ef fected by the Amendment of Order dated April 2S,1980 and the licensee's further stipulation that it will turn over to any successor licensee of T!il, Unit 2 the records required to be maintained by Specifications 6.10.1 and 6.10.2 (with respect to Specification 6.10.1 this obligation shall be linited to those records for which the five year retention period has not yet expired), ECNP withdraws its proposed Contention 5.

0$20 PDR

3.

No amendnents to the license for TitI, Unit 2 or the Proposed Technical Specifications attached thereto.are necessary to effectuate this stipulation.

4 This agreement is sub,iect to the grant'of the " Joint l'otion to

~

Approve Stipulation," which accompanies this Stipulation, by the Atomic Safety and Licensing Board.

Dated this 22nd day of May, 1981 Counse for NRC Staff d dayofp%, 1981 fg///, /./fgj Dated this F2 f

for ECNP

/

J 1981

////./

4/

p Dated this 27th day of May puns / fof-LWnsee

/