ML20030A826

From kanterella
Jump to navigation Jump to search
Forwards Table Showing Current Status of Fuel Storage Facility Operation Space Per 810701 Inventory
ML20030A826
Person / Time
Site: 07001308
Issue date: 07/01/1981
From: Dawson D
GENERAL ELECTRIC CO.
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
19368, DMD-559, NUDOCS 8107290073
Download: ML20030A826 (2)


Text

h r w 73 76-/30 7 aesmen m

GENER AL h ELECTRIC #6

"" ^" '"

ss AND SERVICES GENERAL ELECTRIC COMPANY,175 CURTNER, AVE. SAN J,OSEi,%IFp3NIA 95125 DIVISION Mail Code 861 SPENT FUEL SERVICES OPERATION DMD-559 g

b y\\

q-y

~

July 1, 1981 0[

Jb

~

O JUL 2 21981

  • u.s.gyw Office of Nuclear Material Safety & Safeguards W'i Attn:

L.C. Rouse, Chief

)

Advanced Fuel and Spent Fuel Licensing Division of Fuel Cycle and Material Safety U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

The inventory of spent fuel stored at General Electric's Morris Operation Fuel Storage Facility was unchanged during the months of March and April 1981 and was decreased by the shipment of 8 BWR fuel bundles to Dairyland Power Cooperative's La Crosse Boiling Water Reactor during the months of May and l

June.

In addition, a commitment has been made for the storage i

of fuel from Nebrask3 Public Power District's Cooper Station, contingent on satisfadory resolution of the Illinois legis-lation which presently prohibits s storage. Attached is a table showing the current spt 9 o>

1 N

l Respectfully, 9

GENERAL ELECTRIC COMPANY Yg

?-

I

'.g p$$9

\\q wt arx~

+

1"Trfig,,(,d

.M.

Dawson, Manager e icensing & Transportation 't p

{M;; g g b

s RECEIVED A

x At& iment JUL 161981 >1R 1"m, r Y~

e.s.nuettAa RE00LATOM/ k; "O

com.qss'en ff 4,

c

/

8107290073 810701 FDR ADOCK 07001308 C

PDR

y.

e.

FUEL STORAGE - EXISTING MORRIS OPERATION SPACE July 1,1981 In Under Reserve R: actor Storage Contract Space TeV (Bundles)

Teu (Bundles)

Teu Dresden Unit 2 145 (753)

Connecticut Yankee 33 (80)

San Onofre 95 (270) 32 (88)

Point Beach 42 (109)

Dairyland

  • 0 (0)

Cooper 211 (1056) 142 Uncomitted Total 315 (1212) 243 (1144) 142 Reserve space is that being used as backup to reactor programs and contingency space. The number of bundles cannot be speci-fled until the reactor source is established.

i j

  • Fuel was returned to Dairyland in May and June.

i l

l l

l l-i

..... ~

_