ML20030A773
| ML20030A773 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 04/08/1981 |
| From: | Lichtenberger ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| To: | Page R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| 19091, NUDOCS 8107290009 | |
| Download: ML20030A773 (1) | |
Text
W 3 AA Q ~ }l()
y (A 4p[vfd C-E Power Systems Tel. 203/688-1911 g
Cornbustion Engineenng, inc.
Telex 99297 7
1000 Prospect Hill Road j
Windsor. Connecticut 06095 g
hk POWER H SYSTEMS ggf,@M
{
44 5
,1 a maw w D. h as.tmettAtt fEjWU" License No. SNM-1067_
3U*- $ 5
~
April 8, 1981 g
N."
Docket 70-11g0[
- g
(
9 utso
(
me D
usmic U. S. Nuclear Regulatory Commission Washington, D. C.
20555 6
JUN 0 41981 > 1 Attention: Mr. R. G. Page, Chief MAIL ON
/.<
Uranium Fuel Licensing Branch
'b occmcwtn Division of Fuel Cycle & Material Safety 4
Reference:
NRC Order to Modify License SNM-1067 from R. E. Cunning to H. V. Lichtenberger, datea February 11, 1981 (Radio-logical Contingency Planning Information) 1
Dear Mr. Page:
It is requested that Combustion Engineering, Inc. be granted a 60-day exten-sion to comply with the requirements of the above referenced NRC Order for the following reasons:
- 1) We submitted our license renewal application on December 18, 1980 and are presently resolving a wide scope of NRC comments.
- 2) We have just recently submitted a 5-year up-date of our environmental impact information. This submittal contains information concerning environmental effects of accidents.
Resolution of NRC comments con-cerning this material will also affect much of the information required for the Radiological Contingency Plan.
- 3) Due to delays in scheduled fuel load dates at several utilities, our present storage capacities for fuel pellets and assemblies must be in-creased. We have submitted the required criticality analysis and amend-ment applications and have had several meetings in Washington with licen-sing officials to quickly resolve any comments. This has required an unplanned increase in manhours by our licensing personnel.
Very truly yours, W$0 @jg,Y[
H. V. Lichtenberger
{gg Vice President-Nuclear Fuel Nuclear Power Systems-Manufacturing g Mh/4' ak~
HVL/GAJ/ssb 8107290009 810408 10CE PDR ADOCK 07001100 C
- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _