Responds to NRC Re Violations Noted in Insp Rept 50-155/74-08.Corrective Actions:Offgas Recorder Recalibr in Dec 1974 & Statement of Correction Factors Re Past Reported Stack Particulate & Iodine Releases in Semiannual Rept
ML20030A523
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/05/1975
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20030A521 List:
References
NUDOCS 8101090885
Download: ML20030A523 (1)


Text

g V

- ~..

/ '

COHGUmCiS f,

Q)

POV!00

(~

\\ - u Com any x

x.,..-

'I

{d)

J

[J cenerai on.ces: osa wesi u cn.gan Avenue.s.cason, Michigan 4O20:. Area Cod Si7 788 0550 February 5, 1975 Mr. James G. Keppler Re: Docket 50-155 Region III License DPR-6 US Huclear Regulatory Co= mission Big Rock Point Plant 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Your letter of January 13, 1975 transmitted RO Inspection Report Number 050-155/74-08 and requested additional information with respect to the enforcement action identified under Item B in the Stamary of Findings in the report. Specifically, your letter requested infor-nation regarding the date when full compliance would be achievel for recalibration of the off-gas flow recorder and inclusion of requirements in the " Draft Technical Specifications" of a requirement to semiannuc.lly measure the off-gas holdup time and density. Also, in your letter, you stated that the Semiannual Report should include correction factors to be applied to all past reported stack particulate and iodine releases.

The off-gas recorder was rescaled to indicate the correct off-gas flow rate in December 1974.

In addition, a requirement to measure the off-gas holdup time and off-gas density at ripproximately 6-month intervals has been included in the plant procedures and is being incor-porated into the " Draft Technical Specifications" which are being pre-pared for final submittal at the present time. We felt it was prudent to include this requirement in the plant procedures at present because it is uncertain when the " Draft Technical Specifications" vill be final-ized, approved and become firm requirements.

Although not clearly stated in our November 1, 1974 letter, it was our intention to include a statement of correction factors that would be applied to all past reported stack particulate and lodine releases in the Semiannual Report that is due March 1, 1975. We still plan to carry out this intent.

Yours very truly, Ralph B. Sewell (Signed)

(

RBS/cmm Ralph B. Sewell jg Nuclear Licensing Administrator