ML20030A449

From kanterella
Jump to navigation Jump to search
Notifies That Revised Tech Specs Will Be Submitted on 740531.Schedule Slippage from 740331 Caused by Unanticipated Ofc Personnel Workload Increase
ML20030A449
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/20/1974
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8101090530
Download: ML20030A449 (2)


Text

_ _ _ _ _ _ _ _ _ _ _

Rtgulatory Fib Cy.

\\

CODSumBIS i

POVlCr i

Company

~

i#

General Offices: 212 West Michigan Avenue. Jackson. Michigan 49201. Area Code S17 788-0550 March 20, 197h Mr. D. J. Skovholt Re: Docket 50-155 Asst Director for Operating Reactors License DPR-6 Directorate of Licensing Big Rock Point United States Atomic Energy Commission Washington, DC 20545

Dear Mr. Skovholt:

This letter is written to inform you of a slippage in our schedule to submit to your staff a rewritten version of the Big Rock Point Technical Specifications. This slippage vill result in our submitting a rewritten version of the Technical Specifications by May 31, 1974 instead of the previously committed date of March 31, 1974.

(Refer to our letter dated June 27,1973.)

This delay in the scheduled submittal of the Technical Specifications is due primarily to an unanticipated increase in the workload of the personnel on the General Office staff. This increase is in the area of the fall and winter outage at the Palisades Plant.

As the revised version of the Technical Specifications is in a draft form, we anticipate no difficulty in achieving the May 31, 1974 submittal date.

Yours very truly,

/,

e h :$$ b w 0, RBS/mel Ralph B. Sewell Nuclear Licensing Administrator CC: JGKeppler USAEC o,n..

I s~ t U a:a l

gw1e90630 1

f 1

.AEC DIS.aIBUTION FOR PART 50 DOCKET MATi:. GL (TEMPORARY FORM)

CONTROL NO:__2402 FILE: %W FROM:

DATE OF DOC DATE REC'D LTR MEMO RPT OTHER Consumers Power Company Jackson, Michigan laloh B. Seve11 3-20-74 3-22-74 X

TO:

ORIG CC OTHER SENT AEC PDR XXX

  • ). J. Skovholt 1 signed 39 CLASS UNCLASS PROP IhTO INPUT NO CYS REC'D DOCKET NO:

XXX 40 50-155 DESCRIPTION:

ENCLOSURES:

Ltr adv that rewritten version of Tech Specs will be submitted 5-31-74 (as opposed to their

' ACKNOWLEDGED ltr dtd 6-27-73 ady of 3-21-74 submittal)

DO E0f u uuVE PLANT NAME: BIG ROCK POINT FOR ACTION /IhTORMATION 3-22-74 cmc BUTLER (L)

SC15iENCER(L)

ZIENANN(L)

REGAN(E)

W/ Copies W/ Copies W/4 Copies W/ Copies CLAEX(L)

STOLZ(L) -

DICKER (E)

W[ (Copies' W/ ' Copies,.,

W/ Copies'.,

W/ ; Copies 5

COLLER(L)

VASSALLO(L),

KNIGHION(E) cs W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)

SCHEMEL(L)

YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTEPF.L DISTRIBUTION

(/JEG JILE

, TECH REVIEW DElION A/T IND JAEC PDR

/HENDRIE GRIMES 1.IC ASST BRAIIMAN

/ IGGS (L)

SALEMAN OGC, ROOM P-506A SCHROEDER CAMMILL D

MUNIZING/ STAFF MACCARY KASTNER GEARIN (L)

B. HURT AS'E KNIGHT BALLARD GOULBOURNE (L) ggg GIAMBUSSO PAWLICKI SPANGLER LEE (L)

[ MCDONALD BOYD SHA0 MAIGRET (L)

DUBE w/ Input MOORE (L)(BWR)

STELLO ENVIRO SERVICE (L)

DEYOUNG(L)(PUR)

HOUSTON MULLER SHEPPARD (E)

[ INFO SKOVHOLT (L)

NOVAK DICKER SMITH (L)

C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

B. KING DENISE IPPOLITO YOUNGBLOOD WADE (E)

REG OPR TEDESCO REGAN WILLIAMS (E)

FILE & REGION (3)

LONG PROJECT LDR WILSON (L)

MORRIS LAINAS S. REED (L)

STEELE BENAROYA HARLESS VOLINER EXTERNAL DISTRIBUTION hh 1 - LOCAL PDR

(

/jl - DTIE(ABERNATHY)

(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/NY 1 - NSIC(BUCHANAN)

'l-ASLBP(E/W Bldg,Rm 529) 1-GERALD LELLOUCHE

- ASLB(YORE /SAYRE/

1-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LAB

.,WOODARD/"H" ST.

1-CONSULTANT' S 1-AGMED(Ruth Gussman)

NYS ACRS HOLDING NEWMARK/BLUME/AGP UlIAN RM-B-127, CT.

N 1-cERALD ULRIKSON...ORNL 1-RD.. MULLER..T-309 GT l