Forwards Insp Rept 50-346/94-04 on 940303-0415.No Violations Noted
ML20029E849
Person / Time
Site: Davis Besse 
Issue date: 05/12/1994
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
CENTERIOR ENERGY
Shared Package
ML20029E850 List:
References
NUDOCS 9405230143
Download: ML20029E849 (2)


See also: IR 05000346/1994004

Text

{{#Wiki_filter:_ . _ . . _ _ . M 6eh . . MAY 121994 Docket No. 50-346 Centerior Service Company ATTN: Mr. Donald C. Shelton Senior Vice President- Nuclear c/o Toledo Edison Company 300 Madison Avenue Toledo, OH 43652 Dear Mr. Shelton: SUBJECT: ROUTINE RESIDENT INSPECTION AT DAVIS-BESSE (50-346/94004(DRP)) This refers to the inspection conducted by Messrs. S. Stasek, and J. M. Shine of this office on March 3, 1994, through April 15, 1994. The inspection included a review of activities authorized for your Davis-Besse Nuclear Power , Station. At the conclusion of the inspection, the findings were discussed - with those members of your staff identified in the enclosed report. Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of' selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.. No violations of NRC requirements were identified during the course of this inspection. The operating crews performed very well during this period with the unit continuing to be operated in a controlled, conservative manner. Overall, your engineering groups continue to provide adequate support to the rest of the onsite organization. Of particular note, is the establishment of an action plan to comprehensively evaluate testing and setup of your air operated valves. However, engineering evaluations performed in support of temporary lead blanket shielding were found to be weak in some cases, weaknesses were evident in problem resolution and documentation associated with the lube oil reservoir level switch failure, and we are continuing to review apparent problems associated with the hydrogen recombiner provisions.to control combustible gases following an accident. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC Public Document Room. ' 9405230143 940512 PDR ADOCK 05000346 G PDR f ph -( g . - --

,. . ._ - - . . . - . = - ~ - . - - .- . . - - . . Ski 11 D34 . Centerior Service Company 2 We will gladly discuss any questions you have concerning this inspection. Sincerely, , C. ', ; inn - S tr. yj by R. D, L.u-J R. D. Lanksbury, Chief Reactor Projects Section.3B Enclosure: Inspection Report No. 50-346/94004(DRP) - Distribution cc w/ enclosure: J. K. Wood, Plant Manager W. T. O'Connor, Manager - Regulatory Affairs OC/LFDCB Resident inspector, RIII . LPM, NRR State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health A. Grandjean, State of Ohio, Public utilities Commission S. Stein, SRS ' bcc: PUBLIC j l RIII R RIII Rill Tbf . \\h) 000 {{thj lanksbury Shaftr Olteanu E ger 1 C\\t'\\% 1,0 $

  • ij't3

f3

d - - . . - ..-..s . _ , . . . . ~ . . . . . , . . . . ,, - - }}