ML20029E815

From kanterella
Jump to navigation Jump to search
Confirms Arrangements Made in Telcon on 940422,between T Blandauer & P Steiner for Administration of Licensing Exams at Plant
ML20029E815
Person / Time
Site: Farley 
Issue date: 04/28/1994
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9405230049
Download: ML20029E815 (4)


Text

-

w m_

4 s

q APR 2 81994 Southern Nuclear Operating Company, Inc.

ATIN: Mr. D. N. Morey Vice President P. O. Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICrNSING EXAMINATIONS REPORT NO. 50-348/94-300 The purpose of this letter is to confirm arrangements made in a telephone conversation on April 22, 1994, between Mr. Tom Blandauer, and Mr. Paul Steiner, License Examiner, NRC Region II Operator Licensing Section, for the administration of licensing examinations at the Joseph M. Farley Nuclear Plant The examination preparation visit is scheduled for October 24, 1994.

The written examinations are scheduled for November 3,1994, and the operating examinations are scheduled for the week of November 7,1994.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of October 17, 1994.

To prepare the examinations and meet the above schedule, it will be necessary for. your staff to furnish the reference materials listed in Attachment 2 of ES-201 by August 7, 1994.

Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinationn being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for Your staff to make the simulation facility available on the dates noted above.

Your.. staff should retain the original simulator performance' data (e.g., system pressures, temperatures, and leveis) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

l 9405230049 940428 0'

PDR ADOCK 05000348 V

PDR N

~

~

1 Southern Nuclear Operating 2

APR 2 81994 Company, Inc.

Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination 'date, a postponement may be necessary.

Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (0MB) Clearance Number 3150-0101, which expires October 31, 1995.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing, and mailing the required material.

Send comments regarding this burden esticnate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D. C.

20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE0B-3019, Office of Management and Budget, Washington, D. C. 20503.

From the raquested reference materials identified in Attachment 2 of ES-201, we would appreciate retaining your E0Ps and A0Ps for reference use in our Incident Response Center.

If you have any concerns about this proposed use, please contact me at (404) 331-5541.

Thank you for your cooperation in this matter.

Mr. Blandauer has been advised of the policies and guidelines referenced in this letter.

If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lawrence L. Lawyer, Chief, Operator Licensing Section, at (404) 331-4700, or myself at (404) 331-5541.

Sincerely, ORIGINAL SIGNED BY T. A. PEEBIE Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety cc:

B. L. Moore Licensing Manager Southern Nuclear Operating Company, Ir.c.

P. O. Box 1295 Birmingham, AL 35201-1295 cc cont'd:

(See page 2)

]

So'uthern Nuclear Operating 3

APR 2 8 M)34 Company, Inc.

cc cont'd:

R. D. Hill, Jr.

General Manager, Farley Plant Southern Nuclear Operating Company, Inc.

P. O. Box 470 Ashford, AL 36312 W. R. Bayne, Supervisor Safety Audit and Engineering Review Farley Nuclear Plant P. O. Box 470 Ashford, AL 36312 J. D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, AL 36130-1701 James H. Miller, III, Esq.

Balch and Bingham P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 Lee Williams Training Manager Joseph M. Farley Nuclear Plant P. O. Drawer 470 Ashford, AL 36312 bcc:

(See page 4)

U So'uthern Nuclear Operating 4

APR 2 81994 -

Company, Inc.

bcc:

u. Siegel, NRR F. Cantrell, DRS A. Gibson, DRS G. Hallstrom, DRS P. Steiner, DRS T. Ross, Farley Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 24 Columbia, AL 36319 Document Control Desk t

s l

l was SEND OFC Ril:DRS Rll:DRS RII:DRS TO NAME PStoiner:ps/od Llawyer TPeebles #

I / Eh /94 Y/

/94 Y /_1.I/04

/

/94

/

/94 PDR7 DATE h

s)

I Yes No COPY?

No No Yes No Yes No Yes No OfflC!AL RECORD COPY DOCUHFWT NAME: G:\\LA\\FAR\\t30090DA.PMS

.