ML20029E098

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-1151/94-02 on 940404-07 & Notice of Violation
ML20029E098
Person / Time
Site: Westinghouse
Issue date: 05/04/1994
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Fici J
GENERAL ELECTRIC CO.
Shared Package
ML20029E099 List:
References
NUDOCS 9405160255
Download: ML20029E098 (2)


Text

,....

OFFl0MmmD :0PY MAY 0 41994 Docket No. 70-1151 License No. SNM-1107 Westinghouse Electric Corporation l

ATTN: Mr. J. A. Fici, Manager Columbia Plant Commercial Nuclear fuel Division Drawer R Columbia, SC 29250 Gentlemen:

SUBJECT:

NOTICE Of VIOLATION (NRC INSPECTION REPORT NO. 70-1151/94-02)

This refers to the inspection conducted by C. H. Bassett of this office on April 4-7, 1994.

The inspection included a review of activities authorized for your Commercial Nuclear Fuel Plant.

At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

Based on the results of this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice of Violation (Notice).

The violation is of concern because it shows a lack of procedural compliance by the group that is responsible for ensuring that procedures are followed.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.

In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence.

After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

l The responses directed by this letter and the enclosed Notice are not subject I

to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

L CGor;;

il 9405160255 940504 l

PDR ADDCK 07001151 Y

MM 0 41994 Westinghouse Electric Corporation 2

Should you have any_ questions concerning this letter, please contact us.

Sincerely, ORIGINAL SIGNED BY DOUGLAS to. COLUNS

~

Douglas M. Collins, Chief Nuclear Materials Safety and Safeguards Branch.

Division of Radiation Safety and Safeguards

Enclosures:

1.

Notice of Violation 2.

NRC Inspection Report cc w/encls:

Max Batavia, Chief Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 bcc w/encls:

D. M. Collins C. Bassett R. Bellamy, RI R. Caniano, RIII

'j C. Cain, RIV F. Wenslawski, RIV Document Control Desk bcc w/o encl:

License Fee Management Branch g:\\drss\\rsps\\we402rpt. chb RII:D{Qh\\

"MQ SS Ril:DRSS 1

E CHBassett.'

EJMcAlpine 05/ 3 /94 05/ 3 /94

~

-