( il
0
.
~
MAY
2 1994
i
'
Docket Nos. 50-327, 50-328
Tennessee Valley Authority
ATTN: Mr. Oliver D. Kingsley, Jr.
President, TVA Nuclear and
Chief Nuclear Officer
64 Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
'
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-327/94-09 AND 50-328/94-09)
This refers to the routine resident inspection conducted by W. Holland of this
office from March 6 through April 2, 1994. The inspection included a review
of activities authorized for your Sequoyah facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of the inspection, certain of your activities appeared to
violate NRC requirements as described in the enclosed Notice of Violation. We
are concerned about your lack of attention to detail in the administrative
control of your clearance process. Although control room switches were
determined to be configured in a manner which was desired, the clearance
process did not control tagging as described on tags or tagout sheets.
In addition, the enclosed Inspection Report identifies activities that
violated NRC requirements that will not be subject to enforcement action
because your efforts in identifying and correcting the violation meet the
criteria specified in Section VII.B of the Enforcement Policy.
i
You are required to respond to this letter and should follow the instructions
'
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
'
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
j
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
9405160189 940502
l
ADOCK 05000327
l
0
i
__
.
MAY
2 h?34
.
.
.
,
.
Tennessee Valley Authority
2
In accordance with Section 2.790(a) of the NRC's " Rules of Practice," a copy
of this letter and its enclosures will be placed in the NRC's Public Document
Room.
The responses directed by this letter and its enclosures are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by M. Lesser)
Mark S. Lesser, Section
Reactor Projects Section 4A
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
(See page 3)
..
--
.
.
e,w
g
.A,
HM
gy
-
.
'
Tennessee Valley Authority
3
cc w/encls:
Mr. Craven Crowell, Chairman
Mr. B. S. Schofield, Manager
Tennessee Valley Authority
Nuclear Licensing and
ET 12A
Regulatory Affairs
400 West Summit Hill Drive
Tennessee Valley Authority
Knoxville, TN 37902
4G Blue Ridge
1101 Market Street
Mr. W. H. Kennoy, Director
Chattanooga, TN 37401-2801
Tennessee Valley Authority
ET 12A
Mr. Ralph H. Shell
400 West Summit Hill Drive
Site Licensing Manager
Knoxville, TN 37902
Sequoyah Nuclear Plant
Tennessee Valley Authority
Mr. Johnny H. Hayes, Director
P. O. Box 2000
Tennessee Valley Authority
Soddy Daisy, TN 37379
ET 12A
400 West Summit Hill Drive
Mr. Roger W. Huston
Knoxville, TN 37902
Tennessee Valley Authority
Rockville Office
Mr. O. J. Zeringue, Senior Vice Pres.
11921 Rockville Pike
Nuclear Operations
Suite 402
Tennessee Valley Authority
Rockville, MD 20852
3B Lookout Place
1101 Market Street
Mr. Bill Harris
Chattanooga, TN 37420-2801
Route 1, Box 26
Ten Mile, TN 37880
Dr. Mark 0. Medford, Vice President
Technical Support
Mr. Michael H. Mobley, Director
3B Lookout Place
Division of Radiological Health
-
1101 Market Street
3rd Floor, L and C Annex
Chattanooga, TN 37402-2801
401 Church Street
Nashville, TN 37243-1532
Mr. D. E. Nunn, Vice President
Nuclear Projects
County Judge
Tennessee Valley Authority
Hamilton County Courthouse
3B Lookout Place
Chattanooga, TN 37402
1101 Market Street
Chattanooga, TN 37402-2801
bcc w/encls:
(See page 4)
Mr. Ken A. Powers, Site Vice President
Sequoyah Nuclear Plant
Tennessee Valley Authority
P. O. Box 2000
Soddy Daisy, TN 37379
General Counsel
Tennessee Valley Authority
ET llH
-
400 West Summit Hill Drive
Knoxville, TN 37902
MAY
2 1994
.
'
.
'
Tennessee Valley Authority
4
bcc w/encls:
J. R. Johnson, RII
M. S. Lesser, RII
S. E. Sparks, RII
B. M. Bordenick, OGC
D. E. LaBarge, NRR
G. C. Lainas, NRR
F. J. Hebdon, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
2600 Igou Ferry
Soddy-Daisy, TN 37379
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 2, Box 700
Spring City, TN 3738I
SEND
OFC
RII:DRP
RII:DRP
,
RII:DRP
TO
NAME
WHolland A/[k MLesseddk
PDR?
DATE
04//1/f /94
04/d/94
Ye
COPY
Yes
,
No
Yes
No
Yes
No
Ys
it
0FFICIAL RECORD COPY
DOCUMENT NAME:
G:\\SEC4A\\ 53q;4-09.VIO, SEQ 94-09.WP5
SEQ 94-09.CLT