Text
r-
]
'jk# MCg UNITED STATES f
NUCLEAR REGULATORY COMMISSION E
W G
Hf GloN IV c
f 511 RY AN PLAZA DHIVE, Sulf E 400 o
e ARLINGTON, TE X AS 76011 8064 MAY 6 1934 Docket:
50-382 License: NPF-38 Entergy Operations, Inc.
AlTN:
Ross P. Barkhurst, Vice President Operations, Wuerford P.O. Box 8 Killona, Louisiana 70066
SUBJECT:
OPERATOR INITIAL LICENSING EXAMINATION RESULTS This refers to the meeting conducted in the Region IV office on April 26, 1994.
The attendance list is attached.
This meeting related to performance on the operator license examinations administered earlier this year.
The licensee representatives indicated that:
The overall results from the license examinations were not at the level expected by the licensee.
Written examination scores were about seven points below those for internal examinations administered for all applicants.
The NRC written examination placed more emphasis on situational procedure knowledge than was the case for internal evaluations.
Reliance on multiple choice questions internally may have reduced the depth of knowledge evaluated on internal evaluations.
Operating test performance by those denied licenses has not been evaluated by the licensee, due to other higher priority tasks.
Corrective actions are expected to include use of short-answer questions for internal evaluations and, possibly, use of oral boards in making final determinations.
Corrective actions will be implemented for the next license class, which is expected to start in July 1994.
Retake examinations for the denied applicants should occur during the-September 1994 requalification and procedure inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, f ode of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
T 9405160030 940506 PDR ADOCK 05000382 y
PDR 6
\\
Entergy Operations, Inc. Should you have any questions concerning this matter, we will be pleased to discuss them with you.
homas P. Gwy n, D r ctor Division of
!act afe y
Attachment:
Attendance List cc:
Entergy Operations, Inc.
ATIN: Jay O'Hern, Training Supervisor P.O. Box B Killona, Louisiana 70066 Entergy Operations, Inc.
ATTN:
Harry W. Keiser, Executive Vice President and Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286-1995 Entergy Operations, Inc.
ATIN:
Jerrold G. Dewease, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway ATTN:
Robert B. McGehee, Esq.
P.O. Box 651 Jackson, Mississippi 39205 Entergy Operations, Inc.
ATTN:
D. F. Packer, General Manager Plant Operations P.O. Box B Killona, Louisiana 70066 Entergy Operations, Inc.
ATTN:
L. W. Laughlin Licensing Manager P.O. Box B-Killona, Louisiana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697
Entergy Operations, Inc. Entergy Operations, Inc.
ATTN:
R. F. Burski, Director Nuclear Safety P.O. Box B Killona, Louisiana 70066 William H. Spell, Administrator Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana.70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn-ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502 i
,_y
,n_.
.n.
Entergy Operations, Inc. bcc to DMB IE42 bcc distrib, by RIV:
L. J. Callan Resident Inspector Branch Chief (DRP/D)
Leah Tremper, OC/LFDCB, MS: MNBB 4503 MIS System L. Miller, TTC DRSS-FIPB J. L. Pellet RIV File Proiect Engineer (DRP/D)
Branch Chief (DRP/TSS)
T. P. Gwynn K. Perkins, WCF0 J. T. Gilliland, PA0 C. A. Hackney, SLO C:0B*
ADD:DRS*
D:DRP*
D:DRS*-
JLPellet JAMitchell-ABBeach TPGwynn 5/3/94 5/5/94 5/5/94 5/6/94 I
- Previously concurred l
'O
-e ATTACHMENT MEETING: MANAGEMENT MEETING - ENTERGY OPERATIONS, INC.
SUBJECT:
WATERFORD 3 INITIAL EXAMINATION RESULTS DATE: APRIL 26,1994 ATTENDANCE LIST NAME ORGANIZATION POSITION TITLE T. Brown Entergy Operations, Inc.,
Operations Training Waterford 3 Supervisor J. O'Hern Entergy Operations, Inc.,
Training Manager Waterford 3 D. Vinci Entergy Operations, Inc.,
Operations Waterford 3 Superintendent J. Mitchell NRC Acting Deputy Director, Division or Reactor Safety J. Pellet NRC Chief, Operations Branch D. Desaulniers NRC Engineering Psychologist R. Lantz NRC Examiner J. Tapia NRC Examiner
~.
~
i A
Entergy Operations,-Inc. bec to DMB IE42 bcc distrib. by RIV:
L. J. Callan Resident Inspector l
Branch Chief (DRP/D)
Leah Tremper, OC/LFDCB, MS: MNBB 4503 MIS. System L. Miller, TTC DRSS-FIPB J. L. Pellet RIV File Project Engineer (DRP/0)
Branch Chief (DRP/TSS)
T. P. Gwynn K. Perkins, WCF0 J. T. Gilliland, PA0 C. A. Hackney, SLO C:0B*
ADD:DRS*
D:DRP*
0:DRS*
JLPellet JAMitchell ABBeach TPGwynn 5/3/94 5/5/94 5/5/94 5/6/94
- Previously concurred