Forwards Safety Insp Repts 50-266/94-06 & 50-301/94-06 on 940301-0418.No Cited Violations Noted.One Noncited Violation,One Inspector Followup Item & Three Unresolved Items Noted
ML20029D981
Person / Time
Site: Point Beach  
Issue date: 05/06/1994
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20029D982 List:
References
NUDOCS 9405130218
Download: ML20029D981 (6)


See also: IR 05000266/1994006

Text

{{#Wiki_filter:_ _ _ _ __ _ ._. . ~ . . . _ _ . . _ .. _ _ __ _. 't. 4 d M . ..:

2

- - .. MAY 0 61994 , Docket Nos. 50-266; 50-301 Wiscensin Electric Power Company ATTN: Mr. R. E. Link ! Vice President Nuclear Power 231 West Michigan Street - P379 Milwaukee, WI -53201 Dear Mr. Link: , This refers to the routine safety inspection conducted by Messrs. J. Gadzala and others of this office, from March 1 through April 18, 1994, of activities at the Point Beach Nuclear Plant Units I and 2. Our findings were discussed with Mr. G. J. Maxfield and members of his staff at the conclusion of the inspection. Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with. personnel, and observations. During this inspection, certain of your activities appeared to be in violation of NRC requirements. A contractor failed to advise you'of one of their no/ i employee's positive drug tests when requesting unescorted access authorization for the employee. This incident was investigated by the.NRC Region'III Office i of Investigations. A synopsis of the investigation results is enclosed for your information. While, you are accountable for your contractor's failure to comply with NRC rules, this violation is not being cited because your efforts in correcting it meet the criteria specified in Section VII.B of the " General Statement of Policy and Procedures for NRC Enforcement Actions", o (10 CFR Part 2, Appendix C). No written response or further action pertaining ' to this matter is required. A special NRC assessment conducted during the week immediately following the close of this inspection report identified areas of weak control room operator performance. Examples observed during periods of extended NRC observation included informal communications, inattention to main control board panels, high control room traffic, and overloading of shift supervision with administrative matters. We are concerned by these observations and expect that you will take aggressive, thorough corrective actions. A management meeting has been scheduled for May 13, 1994, to discuss this issue and ensure that we understand your corrective actions. ] Ol ( U f' 9405130218 940506 PDR ADOCK 05000266 O PDR- , _ _- . . _ . .

.. . - . . . .~ . _. .- . - _

' . ' .

. . , , ,

' ' . ' ' MAY 0 61994 ' - Wisconsin Electric Power 2 Company i Your engineers recently determined that Unit 2 was routinely operated approximately 1.5% above its licensed power since 1991. We are concerned that- you were aware of a power mismatch between Units 1 and 2 since 1991 but focused your attention on a perceived loss of efficiency in Unit 1, allowing the high power condition in Unit 2 to go uncorrected. We have not completed our evaluation of the circumstances surrounding operation of Unit 2 above its licensed rated power. Enforcement action pertaining to this issue will be addressed in future correspondence. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room. 1 We will gladly discuss any questions you have concerning this inspection. Your cooperation with us is appreciated. Sincerely, g1G!$4 51GNJD SY. I O. MM.- . Edward G. Greenman, Director Division of Reactor Projects Enclosure: Inspection Reports No. 50-266/94006(DRP); No. 50-301/94006(DRP) cc w/ enclosure: G. J. Maxfield, Plant Manager OC/LFDCB Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman, , '<isconsin Public Service Commission State Liaison Officer bec: PUBLIC i l SEE PREVIOUS CONCURRENCES RIII RIII RIII RIII RIII RIII RIII 0'Dwyer Farber Greger Creed Shafer Gardner Foster (4.b,7.i) (7.a,b) (3.a) (4.a) RIII RIII RIII cso D%r \\ Martin Olteanu Greenmal t 6/U49 {{cod ' 1 l - ,_ _____ _ _. _ ____ _

' . .. J ' . , . . Wisconsin Electric Power 2 Company '

. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room. We will gladly discuss any questions you have concerning this inspection. Your cooperation with us is appreciated.

Sincerely, Edward G. Greenman, Director Division of Reactor Projects Enclosure: Inspection Reports No. 50-266/94006(DRP); No. 50-301/94006(DRP) cc w/ enclosure: G. J. Maxfield, Plant Manager OC/LFDCB Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer ] bcc: PUBLIC @) i RIII RIII RIII RIII RIII RIII RIII c-hlO ffu g Au fwA Cmnf O'Dwyer Farber Greger Creed Shafer Gardner Foster (4.a r l{-7% (4.b, 7.1) (7.a, b) (3.a) 5 /'f W) RIII RIII Martin Greenman - - - -

_ _ _ _ _ _ - Ocd - . Wisconsin Electric Power 2 Company , . We will gladly discuss any questions you have concerning this inspection. Your cooperation with us is appreciated. Sincerely, L. Robert Greger, Chief , l Reactor Projects Branch 3 i l Enclosure: i Inspection Reports l No. 50-266/94006(DRP); l No. 50-301/94006(DRP) cc w/ enclosure: l G. J. Maxfield, Plant Manager l OC/LFDCB ! Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission ! l State liaison Officer RIII RIII RIII RIII RIII RIII RIII y O'Dwyer Farber Greger Shafer Gardner Foster 4.b, 7.i (7.a, b) (3.a) (4.a) ((?if 4i ) l ' i

__ b . , . . Wisconsin Electric Power 2 Company We will gladly discuss any questions yoa have concerning this inspection. Your cooperation with us is appreciated. Sincerely, L. Robert Greger, Chief Reactor Projects Branch 3 Enclosure: Inspection Reports No. 50-266/94006(DRP); No. 50-301/94006(DRP) cc w/ enclosure: G. J. Maxfield, Plant Manager l OC/LFDCB l Resident inspector, RIII Virgil Kanable, Chief l Boiler Section l Cheryl L. Parrino, Chairman, Wisconsin Public Service l l Commission State Liaison Officer ' i p> ' l RIII RIII Rill Rill Ril Rill RIII 0'Dwyer farber Greger Creed Shifer Gardner Foster (4.b, 7.i) (7.a b) (3.a) (4.a) t]lv;k8 , l l .

_ _ - _ _ _ _ _ _ _ _ _ _ _-_ . . '. GedOy)W .'- Wisconsin Electric Power 2 Company We will gladly discuss any questions you have concerning this inspection. Your cooperation with us is appreciated. Sincerely, L. Robert Greger, Chief Reactor Projects Branch 3 Enclosure: ' Inspection Reports No. 50-266/94006(DRP); No. 50-301/94006(DRP) cc w/ enclosure: G. J. Maxfield, Plant Manager OC/LFDCB Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer Rill RIII RIII RIII Rill Rill Rill rW O'Dwyer Farber Greger Creed Shafer Gardner Foster (4.b, 7.i) (7.a, b) (hb 3.a) (4.a) . \\ . . . . - - _ _ _ _ _ _ _ - _ _ _ _ _ }}