Forwards Insp Repts 50-277/94-05 & 50-278/94-05 on 940405-08.No Violations Noted
ML20029D476
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/28/1994
From: Modes M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20029D477 List:
References
NUDOCS 9405060011
Download: ML20029D476 (2)


See also: IR 05000277/1994005

Text

i'

! -

l

l

APR 2 81994

,

Docket Nos. 50-277

l

50-278

!

Mr. D. M. Smith

Senior Vice President-Nuclear

PECO Energy

Nuclear Group Headquarters

Correspondence Control Desk

l

P. O. Box 195

i

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT:

INSPECTION REPORT NOS. 50-277/94-05 AND 50-278/94-05

This letter refers to an inspection conducted by Mr. S. K. Chaudhary on April 5-8,1994, at

I

the Peach Bottom Atomic Power Station, Units 2 and 3, at Delta, Pennsylvania.

,

'

Mr. Chaudhary discussed the results of the inspection with Mr. T. Niessen of your staff on

j

'

l

April 8,1994, at the conclusion of the inspection.

I

The inspection was intended to promote public health and safety, and focussed on the

i

engineering and technical support program that assures the continued integrity of the design

and the operational safety of the plant. Areas examined during this inspection are described

in the NRC Region I inspection report, which is enclosed with this letter. With these

areas, the inspection consisted of selective examination of procedures and represt tative

records, interviews with personnel, and observations by_the inspector.

Within the scope of this inspection, the design change and modification program, and

engineering / technical support to the plant operation were found to be satisfactory, and to

meet the regulatory requirements and your commitments.

I

No reply to this letter is necessary, and your cooperation with us is appreciated.

l

Sincerely

hb

-

Michael C. Modes, Chief

'

Materials Section

Division of Reactor Safety

Enclosure: Inspection Report Nos. 50-277/94-05 and 50-278/94-05

9405060011 940428

{DR

ADOCK 05000277

g 8

PDR

\\

.

1

,

l

-

APR 2 81994

.

Mr. D. M. Smith

2

cc w/ encl:

J. Doering, Chairman, Nuclear Re',iew Board

G. Rainey, Vice President, Peach Bottom Atomic Power Station

W. H. Smith, Vice President, Nuclear Services Department

D. Fetters, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager, Experience Assessment

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department,

Atlantic Eectric

B. W. Gorman, Manager, External Affairs

R. McLean, Power Plant Siting, Nuclear Evaluations

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR)

1

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

j

i

bec w/ encl-

Region I Docket Room (with concurrences)

J. Wiggins, DRS

K. Gallagher, DRP

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

Joseph Shea, NRR

C. Miller, PDI-2, NRR

.

M. Shannon, ILPB

'

RI:DRS

RI:D3

l

Chaudhary

Modes

l

96

4

l

4/z/94

4/ /94

OFFICIAL RECORD COPY

A:PB940505. INS

l

l

!

I

t