ML20029D476
| ML20029D476 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/28/1994 |
| From: | Modes M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20029D477 | List: |
| References | |
| NUDOCS 9405060011 | |
| Download: ML20029D476 (2) | |
See also: IR 05000277/1994005
Text
i'
! -
l
l
APR 2 81994
,
Docket Nos. 50-277
l
50-278
!
Mr. D. M. Smith
Senior Vice President-Nuclear
PECO Energy
Nuclear Group Headquarters
Correspondence Control Desk
l
P. O. Box 195
i
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:
INSPECTION REPORT NOS. 50-277/94-05 AND 50-278/94-05
This letter refers to an inspection conducted by Mr. S. K. Chaudhary on April 5-8,1994, at
I
the Peach Bottom Atomic Power Station, Units 2 and 3, at Delta, Pennsylvania.
,
'
Mr. Chaudhary discussed the results of the inspection with Mr. T. Niessen of your staff on
j
'
l
April 8,1994, at the conclusion of the inspection.
I
The inspection was intended to promote public health and safety, and focussed on the
i
engineering and technical support program that assures the continued integrity of the design
and the operational safety of the plant. Areas examined during this inspection are described
in the NRC Region I inspection report, which is enclosed with this letter. With these
areas, the inspection consisted of selective examination of procedures and represt tative
records, interviews with personnel, and observations by_the inspector.
Within the scope of this inspection, the design change and modification program, and
engineering / technical support to the plant operation were found to be satisfactory, and to
meet the regulatory requirements and your commitments.
I
No reply to this letter is necessary, and your cooperation with us is appreciated.
l
Sincerely
hb
-
Michael C. Modes, Chief
'
Materials Section
Division of Reactor Safety
Enclosure: Inspection Report Nos. 50-277/94-05 and 50-278/94-05
9405060011 940428
{DR
ADOCK 05000277
g 8
\\
.
1
,
l
-
APR 2 81994
.
Mr. D. M. Smith
2
cc w/ encl:
J. Doering, Chairman, Nuclear Re',iew Board
G. Rainey, Vice President, Peach Bottom Atomic Power Station
W. H. Smith, Vice President, Nuclear Services Department
D. Fetters, General Manager, Nuclear Engineering Division
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
A. J. Wasong, Manager, Experience Assessment
G. A. Hunger, Jr., Manager, Licensing Section
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department,
Atlantic Eectric
B. W. Gorman, Manager, External Affairs
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Poulsen, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Public Document Room (PDR)
1
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
TMI - Alert (TMIA)
j
i
bec w/ encl-
Region I Docket Room (with concurrences)
J. Wiggins, DRS
K. Gallagher, DRP
bec w/ encl: (Via E-Mail)
V. McCree, OEDO
Joseph Shea, NRR
C. Miller, PDI-2, NRR
.
M. Shannon, ILPB
'
RI:DRS
RI:D3
l
Chaudhary
Modes
l
96
4
l
4/z/94
4/ /94
OFFICIAL RECORD COPY
A:PB940505. INS
l
l
!
I
t