ML20029D334

From kanterella
Jump to navigation Jump to search
Responds to Notice of Nonconformance.Corrective Actions: Self Evaluation & Writing QA Program Requirements
ML20029D334
Person / Time
Site: 07100086
Issue date: 04/27/1994
From: Hedger T
ALPHA-OMEGA SERVICES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9405050146
Download: ML20029D334 (1)


Text

- _ ___ __-__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  • c o

ALPHA-OMEGA SERVICES, INC.

where avarity ueans exceeding expectations i a d i a t i o' n Therapy Sources and Accessories i

U.S. Regulatory Commission April 27,1994 ATFN: Document Control Desk Washinngton, DC 20555 RE: Reply to a Notice of Non Conformance Docket No. 07100086 1)

Non Conformance 10 CFR 71.105 " Quality Assurance Program"

Response

1) As pointed out in the inspection an un:lcar and unorganized procedures and lack of terminology clarification has resulted in the non compliance's within this section. To correct this problem Alpha-Omega has implemented a self evaluation as suggested by the NRC. The evaluation indicated that the Q.A. program needs to be rewritten in a clear and concise manner as to establish an efficient Q.A. Program.
2) Corrective actions begun: 1) Self evaluation 2) rewriting the QA Program requirement.
3) The rewritten manual will be finished by May 25,1994 and the dated of full compliance will be establish for each section therein.

2)

Non Conformance 10 CFR 71.111 " Instructions, procedures, and drawings".

Response

1) As pointed out in the inspection an unclear and unorganized procedures for document control and lack of terminology clarification has resulted in the non compliance's within this section. To correct this problem Alpha-Omega has implemented a self evaluation as suggested by the NRC. The evaluation indicated that the Q.A. program needs to be rewritten in a clear and concise manner as to establish an efficient Q.A. Program.
2) Corrective actions begun: 1) Self evaluation 2) rewriting the QA Program requirement which will contain better controls for document control.
3) The rewritten manual will be finished by May 25,1994 and the dated of full compliance will be establish for each section therein.

Sincerely, froy Hedger vice president iile AMIPRo\\IXX'S\\NoNNRCR. SAM 9405050146 940427 PDR ADOCK 07100086 C

PDR 9156 ROSE STREET BELLFLOWER. CALIFORNIA 90706 (800) 346-7894 1 h P.O. BOX 789 TELEFAX (310) 804-0610

/

CA (310) 804-0604