ML20029D241
| ML20029D241 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/25/1994 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9405040262 | |
| Download: ML20029D241 (3) | |
Text
'
Southern Nuclear Operating Company 6-4 Post Otr.ce Box 1295 Birmingham. Alabama 35201 Telephone (205) 868 5131 L
Southern Nudear Operating Company o.v. uorey Vice Pres:dunt Farfey Project the Southern e!OCIHC System ENV 94-098 April 25, 1994 Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission ATIM Document Control Desk Washington, DC 20555 Joseph hi. Farley Nuclear Plant 1993 An.nual Environmental Onerating Rep _ ort (NonradiolosigaD Gentlemen:
Enclosed in accordance with subsection 5.4.1 of the Joseph hl. Farley Nuclear Plant Environmental Protection Plan (Units 1 & 2), Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, is the report summarizing implementation of the Environmental Protection Plan during the calendar year 1993.
If you have any questions, please advise.
Respectfully submitted, j
'P/ def.,
Dave hiore LPD: sis ENV 94-098 Enclosurc cc: hqthgtn_Nnglgar._Qpstati_ng Compmy R. D.11i11, Plant hianager UJLNuckadgsu!alorv Commission. Washington. DC D. L. Siegel, Licensing Project hianager U. S. NucJgar Regq!atory Commission. Region 11 S. D. Ebncter, Regional Administrator T. hl. Ross, Senior Resident inspector 9405040262 940425
/ I PDR ADOCK 05000340
<h R
PDR i
4 SOUTIIERN NUCLEAR OPERATING COMPANY JOSEPII M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 NRC DOCKET NOS. 50-348 AND 50-364 FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 1993 (NONRADIOLOGICAL)
ENV-94-098
^
i JOSEPil M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 1993 (NONRADIOLOGICAL)
INTRODUCTIOri in accordance with Subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan (Units 1 and 2), Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, this report is submitted summarizing implementation of the Environmental Protection Plan for calendar year 1993.
REPORTING REOUIREMENTS The following is submitted in accordance with Subsection 5.4.1 of the Environmental Protection Plan.
A.
ENVIRONMENTAL PROTECTION PLAN (EPP) NONCOMPLIANCES AND CORRECTIVE ACTIONS.
There were no EPP noncompliances during 1993.
D.
CliANGES IN STATION DESIGN OR OPERATION, TESTS, AND EXPERIMENTS MADE IN ACCORDANCE WITil EPP SUBSECTION 3.1 WIIICliINVOLVED A POTENTIALLY SIGNIFICANT UNREVIEWED ENVIRONMENTAL ISSUE There were no changes in station design or operation, tests, or experiments during 1993 which involved a potentially significant unreviewed environmental issue.
C.
NONROUTINE REPORTS SUBMFITED IN ACCORDANCE WITII EPP SUBSECTION 5.4.2.
There were no nonroutine reports submitted during 1993.
ENV-94-098
-l
_