ML20029C947
| ML20029C947 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/22/1994 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Connecticut Light & Power Co, Northeast Nuclear Energy Co (NNECO), Western Massachusetts Electric Co |
| Shared Package | |
| ML20029C948 | List: |
| References | |
| DPR-65-A-173 NUDOCS 9405030070 | |
| Download: ML20029C947 (5) | |
Text
,
ga aseg
.j
- +
I P'(
E UNITED STATES li NUCLEAR REGULATORY COMMISSION
/
WASHINGTON, D.C. 20555 0001 NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION. UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.173 License No. DPR-65 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated March 14, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by-this amendment can be conducted without endangering the health and-safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; A
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
940503007o 940422 PDR ADOCK 05o00336' P
ppg
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as' revised through Amendment No.173, are hereby incorporated in the license.
l The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
-f Johfi F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 22, 1994 4
v-
ATTACHMENT TO LICENSE AMEN 0 MENT N0. 173 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 3/4 1-10 3/4 1-10 3/4 7-12 3/4 7-12
.g-
4 s
$URVEILLANCE REQUIREMENT 4.1.2.2 The above required flow paths shall be demonstrated OPERABLE:
At least once per 7 days by exercising all testable power a.
operated valves in each flow path through at least one complete
- cycle, b.
At least once per 31 days by verifying the correct position of all manually operated valves in the boron injection flow path not locked, sealed or otherwise secured in position, and At least once per 18 months *, during shutdown, by exercisingall c.
complete cycle.
d.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the boric acid piping temperature is greater than 55'F.
This may be accom-plished by verifying that the ambient temperature in the vicinity of the boric acid piping on elevations (-)5'-0" and
(-)25-6"isgreaterthan55'F.
i i
?
- Except that the surveillance requirement due no later than April 23,-1994, may be deferred until the next refueling outage, but no later than' September 30, 1994, whichever is earlier.
MILLSTONE - UNIT 2 3/4 1-10 Amendment No. 87. JJJ,173 0122
e
- LANT SYSTEMS 3/4.7.4 SERVICE WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.4.1 Two independent service water loops shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3 and 4.
FCIJJ)fi:
With one service water loop inoperable, restore the inoperable loop to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.4.1 Each service water loop shall be demonstrated OPERABLE:
a.
At least once per 31 days on a STAGGERED TEST BASIS by:
1.
Starting (unless already operating) each pump from the control room, 2.
Verifying that each pump develops at least 93% of the discharge pressure for the applicable flow rate as deter-mined from the manufacturer's Pump Performance Curve.
3.
Verifying that each pump operates for at least 15 minutes, 4.
Verifying that each loop is aligned to receive electrical power from separate OPERABLE emergency busses.
5.
Verifying correct position of all valves servicing safety related equipment that are not locked, sealed or other-wise secured in position, and 6.
Exercising all automatically operated valves servicing safety related equipment and testable during plant operation.
1 b.
At least once per 18 months
- by exercising all power operated valves through one complete cycle of full travel.
- Except that the surveillance requirement due no later than May 5,1994, may be deferred until the next refuelin~g outage, but no later than September 30, 1994, whichever is earlier.
MILLSTONE - UNIT 2 3/4 /-12 Amendment No.173 0123
.