Text
'
..
.
.y 8-
FEB e ? 1994
">
--
QCt p/pn
Docket No. 50-483
gr ..-
~
Union Electric Company
,W
M 21 A8 :14
ATTN: Mr. Donald F. Schnell
Senior Vice President
.;
'
Post Office Box 149 - Mail Code 400
St. Louis, M0 63166
Dear Mr. Schnell:
)
SUBJECT:
FITNESS-FOR-DUTY INSPECTION AT THE CALLAWAY NUCLEAR POWER STATION
This refers to the inspection conducted by Mr. G. Pirtle of this office
between November 29 and December 30, 1993. The inspection included a review
of authorized activities for your Callaway Nuclear Power Station facility.
At the conclusion of the onsite inspection, the findings were discussed with
those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements.
We carefully reviewed the issues in
your December 14, 1993 letter which included your staff's conclusion that a
violation of NRC requirements did not occur. We have decided to forward the
issue to the Office of General Counsel since the issue is one of legal
interpretation and generic applicability.
Pending completion of their review,
we are considering the matter to be unresolved.
Your staff was notified of
this by telephone on February 14, 1994.
We are also concerned that on two occasions unescorted access to the protected
area was granted before confirmation that all requirements _for such access was
completed,_as described in Section 6 of the Report Details. However, to
encourage self identification of problems, the access authorization
lation
has been determined to meet the criteria of a licensee identified vi
tion
and therefore, a separate Notice of Violation will not be issue $
h
'T1
In accordance with 10 CFR 2.790 of the Commission's regulationd a cogy of
this letter and your December 14, 1993 letter will be placed in the NRC Public
Document Room.
$
U
N
'
ga
.
U
9403070027 940223
ADOCK 050004B3
G
. .
.
.
..
- . _ .
_-
-
-
-
.
.
.
Union Electric Company
2
-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Ada
/ C
hbynthiaD.Pederson, Chief
eactor Support Programs Branch
V
Enclosures:
1. Inspection Report
No. 50-483/93021(DRSS)
2. Union Electric ltr
dtd 12/14/93
cc w/ enclosures:
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
S. E. Sampson, Supervising
Engineer, Site Licensing
OC/LFDC8
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
,
K. Drey
C. John Renken, Engineer
Policy & Federal Dept.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
Chairman, Illinois Commerce
Commission
bcc w/ enclosures:
PUBLIC IE04
fj r
l
RIII
g
RIII
RIII
1
f$t
'
/jp 6ets*
reed
Fw
erson
2//f/94 7/>pv
.
,
, . , , ,
.-
A r