r-p APPENDIX U.S. NUCLEAR REGULATORY COMMISSION REGION IV 1
Operator Licensing Examination Report:.50-445/0L 91-01 Operating License: _NPF-87 Docket: 50-445 Licensee: TV Electric Facility Name: Comanche Peak Steam Electric Station 1
Examination at:. Comanche Peak Steam Electric Station I
Chief Examiner:
W 4
3 41-Ja l. Pellet, C11ef Date Operator Licensing Section Division of Reactor Safety Approved by:
YDef$
J.' L. Pellet, Chief late Operator-Licensing _Section Division of Reactor Safety Summary:
NRC Administered Examinations Conducted During the Week of March 4, 1991 (NRC Report 50-445/0L 91-01)
-NRCadministeredwrittenexaminationstotwoseniorreactoroperator(SR0) applicants. The applicants passed the written examination and have been
-issued'the appropriate. licenses.
- ga2ggg ya h y
ran c
.P H
~
- - - - - ~ - - - - ~
~ - -
3
- s
-2 DETAILS d
-1.
PERSONS EXAMINED Pf SRO Total Licensee Examinations:
Pass -
0 2
2 Fail -
0 0
0 2.
EXAMINERS J.LL. Pellet. Chief Examiner
- D.--N. Graves,' Proctor-
- 3. ' EXAMINATION ~ REPORT-
- Perfomance results for~1ndividual candidates are not included in this report-because examination reports are placed in the NRC Public Document Room as a matter of course.
Individual performance results are not subject to-public disclosure.
3;1 - Examination-Review Coment/ Resolution
'In general, editorial coments or changes made as a result of facility reviews
- i prior to the. examination, during the examination, ' r subsequent grading o
reviews'are not addressed by this resolution section. This section reflects-l
= resolution of substantive coments submitted to the NRC by the facility
- licensee after the, examination. The facility licensee post-examination
- coments, less the supporting documentation, are included in the report Limediately
- following the master. examination key, Unless otherwise-indicated 1
-in:thislsection, the facility-licensee coments were incorporated into the 4
fanswer keyc
~All= coments were: incorporated into the examination key.
q
- 3'.2 Site Visit' Sumary The;residentiinspector proctored the administration-of the wr1tten examination
~
Land;provided the facility licensee a copy _of the> examination _ and answer key at 1
t the conclusion of.the examination. The facility' licensee was requested to provide? post-examination review coments as soon as possible to permit timely-
-grading ofithe-examinationa
- 3.3 L General Coments
- Theffollowing: question numbers represent those which were missed by both applicants. They m provided to assist facility evaluation of training:
Jweaknesses.
=-10
~12.
35 38 72 80, 82 92 l
.a -
n r.c
'3.4' Master Examination and Answer' key 1
' A master.-copy off the_ CPSES: license examination and answer key is attached.
5The facility _. licensee comments which have been accepted are incorporated _into
-the; answer, key.
- 3;5_LFacility Examination Review Comments
.The facility: licensee comments regarding the written examination are
- i attached.1 All comments.were' accepted for incorporation into the examinationLanswer key.L
'3.6; Simulation Facility Report LSince the' simulator was not used during this site visit, no report is enclosed.-
-i i
1 i'
( _.
l' j
J -
- ~.